To: Cc: ich Kahn( From: Sent: Tue 5/28/2019 10:53:15 AM Subject: Re: Shade Structure/Engineering Doors Bid (LSJ/GSJ) John Bedminster HI John...thank you so much for these quotes..Jeffrey is asking for the timing of the projects please...when could you start and when is projected completion date. thanks! Lesley On May 25, 2019, at 11:00 PM, wrote: Hello Lesley, Please find attached the proposal for the Shade Structure and the installation of doors at the engineering building. Have a wonderful weekend. Regards John Original Message Subjec )oors Bid (LSJ/GSJ) From: Date: Wed, May 22, 2019 6:56 pm To: John Bedminster < M=I Cc: Mike Glidden <M E, Daphne Wallace •fl, Ann Rodriquez Rich Kahn < Hello John and thank you for your reply! We look forward to receiving your qu ote by Saturday for the Shade Structure and Engineering Doors... .t lari S2119.3 .:41 PM, wrote: HI Sorry about the late response, I was pouring concrete today. I am working on preliminary layout to determine all possible aspect of the shade structure located at the flag pole and pool area. I should be able to deliver the estimate(s) by Saturday the latest. Please let me know if that is okay with you. I will be on St. John in the morning and may not have phone service. If any thing please send a text. EFTA_R1_01119901 EFTA02289438
Best Wishes John Original Message Subject: Shade En ineerin Doors Bid LSJ/GSJ) From: Date: Tu Ma 21 2 1 2:46 pm To: Hello Mr Bedminster. I would like to follow up on the bid you are to propose for the shade structure located at the flag pole pool Mike Glidden has shown you on our island. Can you please get back to me as soon as possible with this bid? Also wondering about the bid for the engineer doors? Please let me know! hT ou, LSJ/GSJ Sent from my iPhone <LSJ-Engincering bldg.pc11, <LSJ-Shadc structure.pdf> EFTA_R1_01119902 EFTA02289439