To: From: Sent: Sun 5/26/2019 12:20:30 PM Subject: Re: Shade Structure/Engineering Doors Bid (LSJ/GSJ) Excellent. Thank you so much! Have a reat da Sent from my iPhonc On May 25, 2019, at 11:00 PM, >< > wrote: Hello Please find attached the proposal for the Shade Structure and the installation of doors at the engineering building. Have a wonderful weekend. Regards John Original Message Subject: Re: Shade Structure/Engineering Doors Bid (LSJ/GSJ) From: Date: Wed, May 22, 2019 6:56 m To: John Bedminster C : Mik li n , Daphne Wallace Ann Rodriquez •: >, Rich Kahn Hello John and thank you for your reply! We look forward to receiving your quote by Saturday for the Shade Structure and Engineering Doors... PM, < wrote: HI Sorry about the late response, I was pouring concrete today. I am working on preliminary layout to determine all possible aspect of the shade structure located at the flag pole and pool area. I should be able to deliver the estimate(s) by Saturday the latest. Please let me know if that is okay with you. I will be on St. John in the morning and may not have phone service. If any thing please send a text. EFTA_R1_01116220 EFTA02288142
Best Wishes John Original Message Subject: Shade /Engineering Doors Bid LSJ GS)) From Date: ue, ay , To: Hello Mr Bedminster. I would like to follow up on the bid you are to propose for the shade structure located at the flag pole pool Mike Glidden has shown you on our island. Can you please get back to me as soon as possible with this bid? Also wondering about the bid for the engineer doors? Please let me know! LSJ/GSJ Sent from my iPhone <LSJ-Enginccring bldg.pdf> <LSJ-Shadc structure.pdf). EFTA_R1_01116221 EFTA02288143