From: Daphne Wallace < Sent: Friday, May 29, 2015 8:50 PM To: Jeffrey Epstein Cc: Rich Kahn Subject: Fwd: FW: Little St. James Attachments: A1.0.pdf; C1.0.pdf Greetings Sir, For your review and comm=nts, the revised drawings of the Maintenance/Workshop Building. =br> Respectfully, Daphne Forwarded message From: John P. Woods, AIA < Date: =ri, May 29, 2015 at 3:45 PM Subject: FW: Little St. James To: Daphne=Wallace < /=», Cecile deJongh «mailto », Ann Rodriquez < > > Daphne, Attached are the revised site and floor plans for the Maintenance/Workshop =uilding. The changes are based upon the site visit held yesterday with Mr.=Epstein. He requested a storage addition to be placed at the northern end =f the building. We have placed that addition at the center of the northern=facade as the most strategic location for the addition. If we place i= further to the west, it will interfere with the access driveway leading t= the main residence. If we place it further to the east, it will be too cl=se to the edge of the abutment, in an area where the soil appears to be un=table. Upon approval of the plan, we will finish the drawings for the CZM =ermit application. JPW Original Message From: JAREDIAN DESIGN GROUP Imailtc Sent: Friday, May 29, 2015 3:11 PM To: John P. Woods Subject: Little St. James JAREDIAN DESIGN GROUP Architects, Engineers and Construction Manager 1 EFTA_R1_02120664 EFTA02710201
This email is free from viruses and malware because avast! Antivirus protec=ion is active. http://www.avast.com=br> 2 EFTA_R1_02120665 EFTA02710202


