From: Boscoe Sent: Thursday, August 30, 2012 12:18 AM To: Monique Harry Cc: [email protected] Subject: Wednesday 07:00 to 14:00 at (Si emptying containers, fueling and commissioning AN's a=d Mules. Repaired and ran crane to unload two new rubbish bins. Place bins a=d park up crane. Return to Stt and go to SBDD to review progress. .Both hydraulic cylinders are removed and placed for pickup tomorrow and d=livery to BlackHawk Shipping .Repair and deadbeding of ramp proceeding well .Shafts and cutlass bearings installed .Rudders being repaired and new support bushings being manufactured. .Stuffing boxes removed and repaired. New hoses and clamps installed. .Motor realignment under way .Bottom paint being applied .Steering gear inspection and repair to start tomorrow. .Progress and man-hour review looks on target . Hydraulic hose assigned for Cat 325 Excavator hammer mounting, made and=brought back to Red Hook @ 17:20 Sent from my iPhone=?xml version=.0" encoding=TF-8"?> <IDOCTYPE plist PUBLIC "-//Apple//DTD PLIST 1.0//EN" "http://www.apple.com/DTDs/PropertyList-1.0.dtd"> <plist version=.0"> <dict> <key>conversation-id</key> <integer>229929</integer> <key>date-last-viewed</key> <integer>0</integer> <key>date-received</key> <integer>1346285914</integer> <key>flags</key> <integer>8590195713</integer> <key>gmail-label-ids</key> <array> <integer>6</integer> <integer>2</integer> </array> <key>remote-id</key> <string>243143</string> </dict> </plist> EFTA_R1_01721357 EFTA02560405