Simply Elegant LTD. General Contracting 191 Newel Street Broo Voice: PROPOSAL #1007-02 Richard Barnett REF: 9 East 71" St, New York, NY November 8, 2013 GYM CEILING I. TO INSTALL DOUBLE '/2 SHEET ROCK ON CEILING. $ 8,280.00 2. TO PLASTER, SKIM COAT, PRIME AND PAINT CEILING AND CROWN MOULDING. CEILING SIZE 18' X 23' 3. RELOCATE GYM EQUIPMENT TO ADJOINING ROOM AND REINSTALL AT COMPLETION. 4 MEN X 8 HOURS = 32 HRS X $65/HR 4. PROVIDE PROTECTION. $ 3,726.00 $ 2,080.00 $ 400.00 SUBTOTAL $14,486.00 GENERAL CONDITION OVERHEAD AND PROFIT $ 2,897.20 TOTAL $17,383.20 1 EFTA_R1_02108428 EFTA02708099
PROPOSAL #1007-02 All material is guaranteed to be as Specified MI work to be COrnfieled in • workmanlike manner according to standard practices My a/dram% or diametral from the above spacScanons rrivolvag t1Va cosls wit be done only upon • maim change order The costs ?All become a extra charge over and ahoy* the efitiffialte This K 10 inClude. but is not Inwled to. hdden damagn that are unto:n.00 dieing the GOWN Of the jet, and iedditiOnal NOM reduced by local building inspectors. M elements of the agreement are contingent upon strikes, accrclents, or delays beyond our control The estimate does not mohair/ material price Increases. or addtanal labor and materials which may be required should undoreseen problems arise awe the work has stared You, the boyar. may cancel the liana:Khan at any lime prat 10 modrugard of the two business day alter the date or Ins hansacton Cancellabon mob' be done 0 ening We Propose hereby to furnish material and labor - complete in accordance with above specifications, for the sum of: 17,383.20 Authorized Signature 11/8/2013 Acceptance of Proposal: The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Signature: Date: 2 EFTA_R1_02108429 EFTA02708100