To: From: Sent: Subject: Boeing ail.com[[email protected]] Sat 10/23/2010 1:41:01 PM Jeffrey. Dave is requesting vacation dates Nov 4th, 5th and 6th, I told him it depends on your schedule, and prefer for Dave to be on board all Boeing flights while we operate that plane the first couple of trips. you mentioned traveling Nov 7th to LSJ from NY, keep my posted, thank you, Larry we tried to fly Boeing yesterday, had the APU running for 1.5 hours, and just before engine start, the apu flamed out, preventing an engine start, this moming APU started normal, with no changes, Larry M said it could have been a fuel vapor lock, or stuck pressure switch preventing ignition for apu start, we are going to change the pressure switch, since we spare on board Boeing, and will do test flight on Monday, all other systems are a go thx Larry v, EFTA_R1_01478635 EFTA02415278