From: Jermaine Ruan Sent: Friday, January 5, 2018 12:44 AM To: Cc: E. Jeffrey Subject: Fiber update Attachments: image1.1PG; Untitled attachment 00111.txt Good evening Rich The fiber was drawn back to the first manhole, but we were unable to identif= the next manhole that the fiber ran to. Danny informed me that he was not o= board when the wapa cable was first installed in the generator building. (=n my recollection it was Micheal Glitten and Gary Moses, the former Electri=n.) Due to today's lack of progress, Liston has switch up tomorrow schedule in o=der to find the route the fiber to tracing back the fiber from the existing=manhole. The manhole is schedule to be cleaned and Liston will have his guy=go into it afterwards and trace back the fiber that way. 1 EFTA_R1_01691695 EFTA02542104