EFTA01657926
Securing Plan • Clearing Teams assigned to this operation will arrive on Little Saint James on August 12, 2019 • Clearing Teams will arrive at the dock located on the North West Tip of the Island • For the purpose of clearing and securing the Island, the Island will be broken up into 4 zones • There will be a total of 4 Teams assigned to clearing and securing the island • Each zone will have a designated Team assigned to clearing and securing their zone • The Team Leader for each team will be responsible for labeling each structure, and documenting the location of the structure. EFTA01657927
Little Saint James Island HE EFTA01657928
Zones James Island • Ledges Of- Little St Jcim EFTA01657929
EFTA01657930
EFTA01657931
Zone 3 EFTA01657932
Zone 4 10 Ledges of Latle St Jamec • EFTA01657933