Carpentry Work Suggest 2 months work - set price to complete further work and inventory and work on woodshop Dock Box top and seat at Dock Refurbish seat hinges and lid - Complete Replace end pieces and refinish tabletop - Complete Master Bedroom Sliding doors need adjusting - Complete Install self closing hinges on water closet door - Complete Dock Boxes at Pools Replace hinges and Rams on both - need to review Pool Cabana Install self closing hinges on toilet door - Complete Shutters Main Compound Adjust 6 hurricane hooks - Complete Add 15 mini exterior hooks - Complete Adjust eyehooks bedroom 4 entrance - Complete Beach Office Weather Proof, Replace Rotten Stair - in progress Installation of New AC and Housing Enclose existing fiber feed and switch Complete Hurricane Bars Fabric shelf for Hurricane Bars - Complete Dock Carpet Replace existing - awaiting carpet Install on Jet Ski Dock - awaiting carpet Engineering Gates Fabricate latches and securing rods - in progress Daisy the Cow Repair broken leg - Complete Steel Shed Removal of existing bolt patterns & installation of new EFTA00583108
Barge Loading Chocks - will start when Barge on LSJ Engine Hatches - awaiting electrical work to be completed Gym Replace Front and bathroom exterior doors - Complete Punching Bag replace - awaiting direction JE ATH Dock Repair/Reconstruct Dock Shed at Barge Dock Managers Cottage Need to replace rotten steps Kite House Repair of Deck Pergola For high road benches - require design details from JE EFTA00583109