Subbase Drydock Parcel #162, Subbase S 0803 T F Name / Address Steve Rampino/Sun Bowt Ocean Services Estimate Date Estimate # 6/13/2007 118 fr MottlAitt ,6 0 Terms Project Proposal Bertha Landing C... Description Qty Cost Total Drydock Haul Out: 70' (reserved for Thursday, July 5th 2007 through Wednesitduly 11th, 2007.) ti ta5 TALI° Laydays 4 1144 apt 1,O" .-tutY g Pressure wash bottom, scrape and sand off marine growth, apply two coats of primer over entire bottom, paint two coats of bottom paint with a third coat at the water line. LABOR: Materials: includes epoxy 235 primer, bottom paint, and all miscellaneous materials.** **Does not include tines. **Steve, usually we require a $500 deposit to reserve your drydock date, but because you are valued customer, we are waiving the deposit. 1-lowever, if for any reason you decide to cancel your drydock haul out, please contact me as soon as possible. Thank you! 70 4 1 1 21.00 250.00 5,300.00 4,100.00 1,470.00 1,000.00 5,300.00 4,100.00 Total $11,870.00 Signature EFTA00616397