Dominik Ziewiec Attn: Richard Barnett white). 9E. 71 STR. Sept 16. 2008. INVOICE 08 4th floor YOGA ROOM, YOGA CLOSET AND BATHROOM SCOPE for Yoga room: - Protection of work area. - Preparation of the cracks on the ceiling. - Plaster work. - Primer work. - Sanding work (to smooth the surface). - Repainting to match existing color (BM flat off white). - Cleaning and removing debris from the area. SCOPE for woodwork - Preparation of the woodwork. - Primer work. - Sanding work (to smooth the surface). - Repainting to match existing color and furish.(oil base) - Cleaning and removing debris from the area SCOPE for Yoga Closet : Ceiling and Walls - Protection of work area. - Preparation of the cracks on the ceiling and walls. - Plaster work. - Primer work. - Sanding work (to smooth the surface). - Repainting ceiling to match existing color (BM flat ,off Repainting walls to match existing color (BM flat.) EFTA00606405
- Cleaning and removing debris from the area. SCOPE for woodwork : Preparation of the woodwork. - Primer work. Sanding work (to smooth the surface). Repainting to match existing color and finish.(oil base) Cleaning and removing debris from the area. SCOPE for touch up Bathroom : - Protection of work area. - Touch ups. - Cleaning and removing debris from the area. Total amount due : $ 8600.00 APPROVED SEP 17 2007 RICHARD BARNETT ( ,fra-4.0 EFTA00606406