Dominik Ziewiec Ann: Richard Barnett 9 East 71 St. Sept.09. 2008. INVOICE 07 6th floor Media room, Cargo elevator and Kitchen area. SCOPE for Media room ceiling: - Protection of work area. - Preparation of the cracks on the ceiling. - Plaster work and spot primer. - Sanding work (to smooth the surface). - Repainting to match existing color (BM flat off white). - Cleaning and removing debris from the area. SCOPE for woodwork : 3 windows casing, baseboard, door frames. - Preparation of the woodwork. - Primer work. - Sanding work (to smooth the surface). Repainting to match existing color and finish. - Cleaning and removing debris from the area. SCOPE for touch up walls in the Kitchen area: APPROVED SEP - 9 2001 RICHARD BARNETT - Protection of work area. - Touch up walls - Cleaning and removing debris from the area. Total amount due : S 3500.00 EFTA00606404