Zorro Project list os of 1/3/2013 PRIORITIZE PROJECT DESCRIBTION !Laborers Hours Rate Labor Cost Material cost Estimated cost Stan Date End Date I Notes Landscaping Main house refurbishment $ 50,000.00 Replace Ponderosa pines $ 59,170.00 Terraces 52,000.00 3/25/2013 Gutter Stucco Telcomm/Data Fiber/Data option 1- ITC $ 137,121.14 Bids to be refined - Rich to conference with b Fiber/Data option 2 - Richard $ 111,773.27 Phones main house $ 30,995.00 Bids on review new system needed - current r Mechanical upgrades Brice to forward bids Cooling tower replacement $ 17,032.08 JCH did pumps Stainless steel option $ 5,168.00 Do not take option Pool pak replacement Unit cost- dehumidifiers in swimming pool area $ 43,170.00 JB Henderson Engineering $ 6,000.00 Other cost $ 5,000.00 HAVAC control system Needs upgrade Tools Audio/TV upgrades Western Systems estimated with options $ 125,000.00 Proposal Vehicles/Equipment Purchase new suburban LV to get quote Brush Hog Well Fully on line with Well -K, waiting to hear permit should be Iinahred by the end or Om week in is Roof Continue to maintain Fountain - determine cause of leak Paris upgrade lot 2 EFTA00598479
Zorro Project list os of 1/3/2013 ice toia hone "IC EFTA00598480


