Prime Renovations & Painting 12 Cora Court Hampton Bays New York 11946 U.S.A (917)287-2878 (631)680-2238 Bill To Mervin Dela Cruz 9 East 71 St New York 10021 New York utru. 1 SCOPE OF WORK: Site protection protect all work areas using masonite boards protect any walls as needed with plastic covers protect bedroom floors and walls during the duration of the work 2 Plumbing 1. shut down water to the steam shower during the work period 3 Finish Work 1. prep walls for the installation of new tiles 2. install new tiles to the ceiling, walls, bench and floor 3. grout tile 4 Electrical supply and install new exhaust fan exhaust steam into shower install switch for exhaust fan to turn on when exiting the steam room install new lighting in steam room 5 Cleaning thoroughly clean all the work areas and remove all tools and any other debris left Notes All tiles and any other fixtures are to be provided by client Estimate # EST-1177 Estimate Date : 10/25/18 Qty 1.00 3,000.00 3,000.00 1.00 1,000.00 1,000.00 1.00 13,500.00 13,500.00 1.00 3,800.00 3,800.00 1.00 1,000.00 1,000.00 Sub Total 22,300.00 Total $22,300.00 EFTA00521487
Terms & Conditions Looking forward to your business Estimate valid for 30 days 50% deposit required to begin work Contractor: Prime Renovations & Painting (signature) Date: Client: Mervin Dela Cruz (signature) Date: EFTA00521488
