From: Richard Kahn To: Brandon Thompson Subject: Re: Library Date: Thu, 23 Apr 2015 12:25:35 +0000 Thank you for update. You promised pictures yesterday. Can you please send today. Sent from my iPhone > On Apr 22, 2015, at 9:27 PM, Brandon Thompson <=I > wrote: > Dear Mr. Kahn, > I will send you an update each day from now on. We are working on the horizontal surfaces now and the moldings. > The Library never reached its full potential in terms of design. As I mentioned before, it was finished with liming-wax and with time, many parts became purple. I stipulated several reasons, one of them was the use of improper wax. > The wax reacted with white pigment and turned light looking surfaces into purple. The other factor was the mold and the fungi. We have thousands little spots on the woodwork. which we are trying to eliminate. > I decided to change the design in the Library and to make it alive. I will use matt surfaces against shiny ones. rough surfaces against very smooth. I also intend to extend the design of the Turtle-shell decorations to unite or tie it together on the cabinet doors and secretary's lids. . Since the woodwork is so much darker on the base, I am not going to fight it. I will give a 6" strip of Turtle-shell decoration on the floor to make sharper contrast between the floor and the Oak woodwork. I will have much, much more work, but I hope will meet with an approval of Mr. Epstein. > I already have vision of final decoration in mind. It took me a little while, but from now on we will zoom for the final results. > Kindly, > Brandon EFTA00858706