From: Amy Dempsey cMia> To: Jeffrey Epstein <[email protected]> Subject: Fwd: [Non-DoD Source] With drawing attached. (UNCLASSIFIED) Date: Fri, 13 Apr 2018 16:36:35 +0000 I just sent him the wetland drawing (I finally got from Ryan), and he sent this back. Amy Claire Dempsey, President, Bioimpact, Inc. Box 132 Kingshill St. Croix, U.S. Vi in Islands 00851 Fax ----- Forwarded message --- From: Date: Fri, Apr 13, 2018 at 12:32 PM Subject: RE: [Non-DoD Source] With drawing attached. (UNCLASSIFIED) To: Amy Dempsey <I mc M CLASSIFICATION: UNCLASSIFIED Amy, The proposed actions below could be done relatively quickly and bring his islands back into compliance. Remove the fill starting from 4 feet landward of the mangrove fringe working watenvard -restore area with mangroves- all applicable wetlands Submit an after the fact application to retain the road through the wetland and propose mitigation.-A culverted road would be a good idea Submit evidence the retained dock now complies with originally permitted configuration Stock pile riprap boulders in an upland location. Submit a new application to PR office for new dock proposal to include removal of unauthorized dock. Remove the last barge landing. Most of this will be documented as voluntary restoration. I will get started on the after the fact road permit as soon as an application is submitted. I trust that everyone is going to do the right thing, but I need a report with photos to record Mr. Epstein's efforts for future reference. V/r Jonathan EFTA00836820
Original Message From: Amy Dempsey [mailto: Sent: Friday, April 13, 2018 11:58 AM To: ) < Subject: [Non-DoD Source] With drawing attached. Amy Claire Dempsey, M. President, Bioimpact, Inc. M. Box 132 Kingshill St. Croix, U.S. Vi in Islands 00851 Fax <mailto CLASSIFICATION: UNCLASSIFIED <mailto: EFTA00836821


