72- WATER START END NOTES PHOTO STATUS DEVELOPMENT 5/6/2014 3/4/19 - Pumping Water into Pond 24/7. Updated Readings will be forwarded to Casey Cook to confirm progress 3/8/19 966 - PAVING OF START END NOTES PHOTO STATUS ROADWAY 6/29/2017 2/12/19 - Gilbert Luna (Universal Paving) & his Forman On Site to Review Final Section of Work. He Proposed Only to "Fix" 2000' - MH Z to Bull Head. He indicated Fix for Office to Main Gates. Proposed Work to begin March. BG has concerns regarding "Fix" & Proposed Start Date, due to Temps. Recommend late April/May. BG explained Owner would want New Surface to Run from MH Z to Cattle Guard RC, Office to Main Gates BG indicated a payment of 100k, Gilbert Luna would need to sign Legal Binder. He expressed concerns as requested work would cost him approx. 100k. He was to review numbers & get back with BG. As of date & time no contact has been made. Should we contact Mountain States or another Company to see if Awaiting they are interested in providing a Proposal for a "Fix"? Response 102 - LUTRON START END NOTES PHOTO STATUS SYSTEM - MH 2/22/2019 2/22/19 - Forwarded E Mail with Photos to RMC Electric showing the existing system Due to weather issues Lutron Rep has cancelled Site Visit to review existing system 3 times 3/8/19 - Lutron Rep Due On Site 3/8119 - Lutron Rep Due On Site 118B PURCHASE START END NOTES PHOTO STATUS WATER TRUCK Will review with JE when On Site 118C - PURCHASE GRADER START END NOTES PHOTO STATUS Will review with JE when On Site Pagel EFTA00811070
134 - POOL PAC START END COMPRESSOR - MH 2/2/2019 NOTES PHOTO STATUS 2/27/2019 2/2/19 - Received Quote to Purchase/Install Pool Pac Compressor from Honeywell 2/26/19 - Honeywell on Site to Install Compressor 136 REFURBISHMENT RED HOUSE START 1/21/2019 END 2/27/19 - Compressor Install Running 100% NOTES I PI S Complete STATUS 2/1/19 - 1/3 Down - House Incorporated - Demo/Remo Upper & Lower Levels 2/27/19 - 1st Coat Painting on Wall & Ceiling Complete 2/27/19 - Airpro Installed New Furnace, Condenser/AC Split Unit will be Installed when Weather Permits 2/28/19 - Installation of Tile Floor Started. Due to very uneven floors, taking longer that expected 3/1/19 - Installation of Shower Tile in Sm Bathroom Started 3/1/19 - Purchase Shower Tub - Master Bathroom Granite Ordered Carpet Ordered 3/5/19 - Fireplace Insert Due On Site Cabinets On Site - Installed week of 3/11/19 Appliances Due On Site 3/7/19 - WAR. fjj, START END NOTES PHOTO STATUS 2/7/2019 3/8/19 - Repairs Due to be completed Awaiting Repair Page 2 EFTA00811071
137 - START END NOTES PHOTO STATUS PURCHASE/INSTALL FURNACE -STABLES 2/19/2019 2/28/2019 2/12/19 - Proposal Forwarded to RK to Remove/Dispose of Existing Furnace. Furnish/Install 1 Carrier 110,000 BT Furnace in Stables. 2/16/19 - RK requested 10% Discount 2/19/19 - Airpro Discounted 10% 2/21/19 - 50% Deposit Paid to Airpro 12/27/19 - Airpro Installed New Furnace 2/28/19 - Furnace Installed. Running 100% 3/4/19 - Paid Balance to Airpro Project Total 138 - PURCHASE/INSTALL AC SPLIT UNIT & FURNACE - LV'S HOUSE 139 - P URCHASEJI NSTALL AC SPLIT UNIT & FURNACE - YELLOW HOUSE START I E 2/19/2019 START END NOTES x Awaiting Response (2/16/191 Comic' PHOTO STATUS 2/12/19 - Proposal Forwarded to RK to Remove/Dispose of Existing Swamp Cooler. Fumish/Install 1 Carrier 4 ton AC Split Unit .and Furnace to LVs House 2/16/19 - RK requested 10% Discount 2/19/19 - Airpro Discounted 10% 2/21/19 - 50% Deposit Paid to Airpro 2/25/19 - Matenal/Parts Ordered Awaftlna Response 12/16/19) NOTES PHOTO STATUS 2/19/2019 2/12/19 - Proposal Forwarded to RK to Remove/Dispose of Existing Swamp Cooler. Fumish/Install 1 Carrier 3 ton Furnace to Yellow House 2/16/19 - RK requested 10% Discount 2/19/19 - Airpro Discounted 10% 2/21/19 - 50% Deposit Paid to Airpro 2/25/19 - Material/Parts Ordered x Awaiting Response (2/16/19) Page 3 EFTA00811072
140 P URCHASE/I NSTALL X 6 UNIT HEATERS - GARAGES RC START END NOTES PHOTO STATUS 2/19/2019 2/12/19 - Proposal Forwarded to RK to Remove/Dispose of x Awaiting Existing 6 Heaters. Fumish/Install 6 Sterling Unit Heaters - Response Garages RC (2/16119) 2/16/19 - RK requested 10% Discount 2/19/19 - Airpro Discounted 10% .2/21/19 - 50% Deposit Paid to Airpro 2/25/19 - Material/Parts Ordered. Installation expected 3/14/19 141 - CARPET LODGE START 2/11/2019 END 142 - PHONE SYSTEM • START LODGE & LOG 143 - SECURITY CAMERAS -FRONT GATES Awaiting Installation NOTES PHOTO STATUS 2/11/19 - JE Approved New Carpet, Blinds/Curtains, Tile in Bathrooms & Laundry. New Light Colored Carpet Have Swatches & Samples to Show when On Site x NOTES PHOTO STATUS Project Placed On Hold 1/10/18 Are we still to proceed with Verizon Cellular Phone Line for Lodge? Are we still to proceed with Verizon Cellular Phone Line & Solar Generator for Log Cabin? START END NOTES Awaiting Response Awaiting Response PHOTO STATUS Existing Security Camera System has Failed. Gates Operational Reviewing Options - Option 1 Did Not Work as Cellular Provider was AT&T. Reviewing other Options Page 4 EFTA00811073
i4 - SEPTIC START END NOTES PHOTO STATUS SYSTEMS -RC I Septic Line to the Tank & the Leaching Field for the BH need replacing. Roots from Trees have Compromised the Line. The Adobe is in the same situation 12/28/2019 2/28/19 - All RC Septic Tanks, Pumped Out PHOTO Awaiting Gene Basset will forward a Proposal for Removal/Installation New Septic Tank by 3/12/19 Proposal STATUS 145 - GARAGE DOORS START END NOTES - RC 146 - REFURBISHMENT PHOTO STSTUS WM Review when JE On Site START END NOTES -t-- Repair & Painting of all Picket Fences - April 2019 Awaiting PICKET FENCES - RC Contacted Gary Mann (RK Contact). He contacted Mercedes reference Windshield Repair - Unable to come up with Solution. Gary was to contact Guard Car Companies, have left a message requesting update James Ce forwarded History of Existing Library Computer, Feb 2015 How do you wish to proceed? Programming Issues resolved. System Running 100% Awaiting for Break in Weather Once Weather Breaks Work will Start on Collapsed Section/Dry Stack Walls & Lavender Beds WINDSHEILD - 2002 MERCEDES Response COMPUTOR - Awaiting LIBRARY - MH HVAC • MH Response Cw St SITE WALLS & MISC PLASTER WORK -MC LANDSCAPE - EAST GARDEN Page 5 EFTA00811074
LANDSCAPE - Need to get the Fountain Pit, repowdered where all the lighting LIGHTING controllers are located 2/18/19 - Work to begin LAMPS -LODGE Purchased X 4 New Lamps to replace lamps that where broken during 2018 burglary Complete Page 6 EFTA00811075