March 4, 2018 SSVI EXPERT, LLC QUOTE FOR GREAT ST. JAMES TO: Broke Away Dock Section Reconstruction of Broke away Dock (Jet Key Area)- $4,800.00 Reconstruction Shelter 1 Scope of work: Installation of 8 upright columns (wooden) Hip Roof (according to existing drawings Installation of Cyprus under thatching Thatching on top- S27.000.00 Replacement of slots on dock 54.200.00 Repair of concrete on each side of Shelter 2 $2,500.00 TOTAL COST: $38,500.00 Sincerely, Ce/e/eifrg eZerts Elderfield Roberts Director SSVI-EXPERT BUILDERS LLC EFTA00808005