From: "Stephen Caplinger" < To: "'Jeffrey Epstein"' [email protected]> Cc: "'Gary Kemey'" ana Subject: LSJ Date: Fri, 31 Jul 2009 19:02:03 +0000 Attachments: 090731_Helipad_Package.pdf Inline-Images: image00 1 jpg; image002.gif; image003.gif Jeffrey: These are the items that we would like to discuss in addition to Gary's budget & schedule items: I. Overall Master Plan Update 2. Private Drive from Driveway to Office Pavilion 3. Boat Dock Entry Study 4. Helipad & ATV Garage Concept (Attached) 5. Typical Road Paving Detail Attached is a concept site plan study for the Helipad & ATV Garage. This concept envisions that the existing stone stairs and walls would remain but the new ATV Garage & Lobby areas would be lowered approximately 5'-6' below existing grade. This would allow the roof area to be grassed over and become part of the helipad. This concept is probably the cleanest and also reduces the structure costs of the building. I look forward to our meeting on Monday. aes STEPHEN M. CAPLINGER Vice President Design & Planning LANDMARK LAND COMPANY 4908 Broolcsview Circle New Albany, Ohio 43054 EFTA00773215
From: Kyle Albert [mailto: Sent: Friday, July 31, 2009 2:26 PM To: Stephen Caplinger Subject: Kyle Albert project manager M S I 462 South Ludlow Alley Columbus, Ohio 43215 V www.msidesign.com 4 -P consider the environment before printing EFTA00773216


