LSJ, LLC bificifRequest: 02 December 2008 Requested By: W. Rowles Time Frame for Purchase/Repair: Urgent:OX Inventory: O Other: O Item/Items Requested: 200 ton of manufactured sand *cher); Cd.1 eau ;01M Purpose/Description: Misc. masonry,SWfte-Pavilion concreW Company Name: Heavy Materials Website or Special Purchase Instructions: Purchase Price: 200 ton @ $42.50 per ton = $8,500.00 Tax; Shipping Cost: (Attach Quote) 8 Trips @ $190 = $1,520.00 Ship Via: Other: Trucking 8 Trips @ $270 = $2.160.00 Total Expected Cost: $12,180.00 Deposit Required?Yes:O $ or % No:CIX Payment Method: House Acct, to be billed: X Check: Wire Transfer: Credit Card of Requester: LSJ Company Card: Quote Attached: Yes:E3 No:CIX Competitive Quotes Obtained? Yes: O No:CIX If No, Why Not: Island supplier Authorization: Ad/ 14-34\b02- 03—\30 EFTA00610463
LSJ, I_LG Date of Request: 02 December 2008 Requested By: W. Rowles Time Frame for Purchase/Repair: Urgent:OX Inventory: O Other: O Item/Items Requested: 200 ton of Colombian sand Meth\CeiZCA By ;IckreS Purpose/Description: Misc. masonry, Office-Pavilion-concretes Company Name Heavy Materials Website or Special Purchase Instructions: Purchase Price: 200 ton @ $70.00 per ton = $14.000.00 Tax: Shipping Cost: (Attach Quote) 8 Trips @ 5190 = $1,520.00 Ship Via: Other: Trucking 8 Trips @ $270 = $2,160.00 Total Expected Cost: 517,680.00 Deposit Required?Yes:O $ or % No: OX Payment Method: House Acct, to be billed: X Check: Wire Transfer: Credit Card of Requester: LSJ Company Card: Quote Attached: Yes:El No:EIX Competitive Quotes Obtained? Yes: O No:OX If No. Why Not: Island supplier Authorization: a ff 1Fiek 4110,1104:01dv 1r LsZ 44/00 63230 fr2 EFTA00610464
LSJ, LLC Date of Request: 02 December 2008 Requested By: W. Rowles Time Frame for Purchase/Repair: Urgent:OX Inventory: O Other: O Itemlltems Requested: 200 +/- ton of stone tatriusActa I egidaZitn Purpose/Description: Misc. Island concrete. Gliftee-Pavrttem concTete Company Name: Heavy Materials Website or Special Purchase Instructions: Purchase Price: 200 ton @ $33.00 per ton = $6.600.00 Tax: Shipping Cost: (Attach Quote) 8 trips @ $190 = $1.520.00 Other: Trucking 8 trips @ $270.00 = $2,160.00 Total Expected Cost: $10,280.00 Ship Via: Deposit Required?Yes:O $ or No:OX Payment Method: House Acct, to be billed: X Check: Wire Transfer: Credit Card of Requester: LSJ Company Card: Quote Attached: Yes:CI No:OX Competitive Quotes Obtained? Yes: O No:OX If No, Why Not: Island supplier Authorization: Ir. ST\ Aio o --)30 EFTA00610465
Emad Hanna From: Jeffrey Epstein [email protected]] Sent: Tuesday. December 02, 2008 4:46 PM To: Emad Hanna Subject: Re: Material yes On Tue, Dec 2, 2008 at 4:34 PM, Emad Hanna Jeffrey, > wrote: I received 3 requests for material for the Mechanical Building concrete pour due to happen on Thursday. 1) 200 tons of stone S 10,280 2) 200 tons of Manufactured Sand S 12,180 3) 200 tons of Colombian Sand S 17,680 Brice has signed off on all three. Do I have you approval to process these? Thank you Emad Hanna Project Controller NES, LLC 457 Madison Ave EFTA00610466


