Tricon, Inc. 5032 Norre Gade, Suite No. 1 Owners Rep.: Michael St. Thomas, VI 00802-6700 Little St. James Phone: 340-714-5355 Cell: 340-344-6096 Proposal for Engineering Bldg. doors Date: May 25, 2019 Proposal: Repair & construction Estimate LINE DESCRIPTION QUANTITY UNIT PRICE UNIT DESC AMOUNT 1 Trucking: Removal of construction debris, as per VI code metals shall not be mixed with other debris. 1.00 990.00 LS 990.00 2 Remove 36"x96" metal doors with vinyl coating 6.00 165.00 each 990.00 2 Install 36"x96" metal doors with vinyl coating 6.00 434.50 each 2,607.00 2 Install 36"x96" metal doors with vinyl coating 6.00 434.50 each 2,607.00 2 Install 36"x80" metal/vinyl coated doors/ 18.00 412.50 each 7,425.00 2 Remove existing metal door frames 2.00 137.50 each 275.00 2 Install new metal door frame 2.00 275.00 each 550.00 $15,444.00 EFTA00305815