5
Shared Docs
5
Same-Page
5 / 5
Mentions
izer and fille? On Thu, Oct 1, 2015 at 8:46 PM, =rice Gordon Jeffrey attached photos of Log cabin for
ean time the access road behind =he MH to proposed new site needed work and a slight change of layout so du=p truck was not continually driving over Spetic Tanks located to the South=East of Mechanical Building. The storm water pipping from the MH that goes under th=s road also need work, this work has been
8 /a» <mailto: wrote: Ok Confirming we will concentrate on log cabin until we get des=gn confirmation for New garden at main house Thank you = Brice Sent from my iPhone O= Sep 2, 2015, at 10:58 AM, jeffrey E. <[email protected] <mailto:jeevacation@gma=l.com» wrote: =blockquote type="cite">
ean time the access road behind the M= to proposed new site needed work and a slight change of layout so dump tru=k was not continually driving over Spetic Tanks located to the South East o= Mechanical Building. The storm water pipping from the MH that goes under this road a=so need work, this work has been
will match Existing Log Cabin Steps any concerns let me know Load Tally to Date for Log Cabin Rocks Q 12 loads Dirt/Back Fill 44 loads regards Brice wrote: Je=frey E. 1=:00 AM (11 hours ago) om <mailto: > wrote: to me, Richard how long to make level with the plan i produced or=ginally for g
ean time the access road behind the MH to proposed new site need=d work and a slight change of layout so dump truck was not continually dri=ing over Spetic Tanks located to the South East of Mechanical Building.Q The storm w=ter pipping from the MH that goes under this road also need work, this wor= has be
ce Gordon mailtoO > wrote: <=lockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:lpx #=cc solid;padding-Ieft:lex"> Jeffrey regards Brice On Sun, Sep 13, 2=15 at 11:35 AM, Brice Gordon O<mailto > wrote: =blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:lpx=44ccc soli
ean time the access road behind the MH to propo=ed new site needed work and a slight change of layout so dump truck was not=continually driving over Spetic Tanks located to the South East of Mechanic=l Building. been completed. The storm water pipping from the MH that goes under this road also need w=rk, th
Drainage, under the present plan/grade, in the event =f a down pour proposed path material and small landscape walls will get wa=hed away regards Brice On Wed, Sep 2, 2015 =t 11:26 AM, Zorro Ranch < <mailto > wrote: Ok Confirming =e will concentrate on log cabin until we get design confirmation f
ean time the access road b=hind the MH to proposed new site needed work and a slight change of layout=so dump truck was not continually driving over Spetic Tanks located to the=South East of Mechanical Building. The storm water pipping from the MH that goes un=er this road also need work, this work has been
Entities connected to both Condoleezza Rice and Spetic Tanks

Jeffrey Epstein
PERSONBrice Gordon
PERSON
Jes Staley
PERSONLinda Pinto
PERSONHerman
PERSONthe South East
LOCATIONLog Cabin
PERSON