8
Shared Docs
8
Same-Page
8 / 8
Mentions
. Schedule AHF again for floor =epairs in cabana 3 We need to be absolutely =nbsp;confident in plumber and tile for master bath Reno before moving Brice Sent from my =Phone On Dec 27, 2018, =t 3:57 PM, Richard Kahn < <mailto:[email protected]» wrote: Brice / Kyle 2 EFTA_R1_01796600 EFTA02
alve filled with water, which resulted in water seeping into the =athroom and bedroom The floors in both areas will need to be =eplaced, along with the Bedroom Rug and most probably the bathroom 'cabinetry All other furnishing have been removed and =laced in Cabana 4 Repair to line is in progress I will forw
le AHF again for floor repairs in cabana 3 <=div> We need to be absolutely confident in plumber and tile for =aster bath Reno before moving forward Brice <=iV> 2 EFTA_R1_01799005 EFTA02607280 Sent from my iPhone On Dec 27, 2018, at=3:57 PM, Richard Kahn < <mailto: > wrote: Brice / Kyle Than
alve filled with water, which resulted in water seeping into the bathr=om and bedroom The floors in both areas w=ll need to be replaced, along with the Bedroom Rug and most probably the b=throom Cabinetry All other furnishing ha=e been removed and placed in Cabana 4 Re=air to line is in progress I will forwa
style="margin:0px 0px 0px 0.8ex;border-l=ft:lpx solid rgb(204,204,204);padding- left:lex"> I have n=ver seen a budget for shade house. Should I ask Brice? Please advise= Thank you. Richard Kahn HBRK Associates Inc. By Friday afternoon Cabana's 1 and 4 will be ready <=iv>At this time both Cabana's 2
alve filled with water, which resulted in water seeping into the bathr=om and bedroom The floors in both areas w=ll need to be replaced, along with the Bedroom Rug and most probably the b=throom Cabinetry All other furnishing ha=e been removed and placed in Cabana 4 Re=air to line is in progress I will forwa
hard Kahn <la Sent: Thursday, December 27, 2018 10:42 PM To: Subject: Re: LS1 Cabana 3 I have never seen a budget for shade house.=Should I ask Brice? Please advise. Thank you. Update By Friday afternoon Cabana's 1 and 4 will be ready <=r> At this time both Cabana's 2 and 3 have plumbing issues,
alve filled wit= water, which resulted in water seeping into the bathroom and bedroom The floors in both areas will need to be replace=, along with the Bedroom Rug and most probably the bathroom Cabinetry All other furnishing have been removed and plac=d in Cabana 4 Repair to line is in progre=s I will forwa
Schedule =HF again for floor repairs in cabana 3 We need to be absol=tely confident in plumber and tile for master bath Reno before movin= forward Brice EFTA_R1_01799844 EFTA02607794 =div> Sent from my iPhone On Dec 27, 2018, at 3:57 PM, Richard Kahn wrote:=br> Brice / Kyle =div> Thanks for u
alve filled with water, which resulted in water seeping into the bathr=om and bedroom The floors in both areas w=ll need to be replaced, along with the Bedroom Rug and most probably the b=throom Cabinetry All other furnishing ha=e been removed and placed in Cabana 4 Re=air to line is in progress I will forwa
Schedule AHF again for floor repairs in caba=a 3 We need to be absolutely confident in plumber an= tile for master bath Reno before moving forward Brice EFTA_R1_01800773 EFTA02608288 =br> =br> Sent from my iPhone On Dec 27= 2018, at 3:57 PM, Richard Kahn wrote: =blockquote type=ficiten> Bric
alve filled with water, which resulted in water seeping into the=bathroom and bedroom The floors in both a=eas will need to be replaced, along with the Bedroom Rug and most probably=the bathroom Cabinetry All other furnish=ng have been removed and placed in Cabana 4 Repair to line is in progress I will forwa
t in plumber and tile fo= master bath Reno before moving forward Bric= Sent from my iPhone <=r>On Dec 27, 2018, at 3:57 PM, Richard Kahn wrote: Brice / Kyle Thanks=for update. Who's is responsible for this hot water line? Was=jay involved? Our crew? Was this the first time water was tested? &nb=p
valve filled with water, which resulted in water seeping into the bat=room and bedroom The floors in both areas w=ll need to be replaced, along with the Bedroom Rug and most probably the ba=hroom Cabinetry All other furnishing have=been removed and placed in Cabana 4 Repai= to line is in progress I will forwa
le AHF again for floor =epairs in cabana 3 We need to be absolutely =nbsp;confident in plumber and tile for master bath Reno before moving =orward Brice EFTA_R1_01802643 EFTA02609023 Sent from my iPhone On Dec 27, 2018, at 3:57 PM, Richard Kahn wrote: Brice / Kyle Thanks for update. Who's is r
alve filled with water, which resulted in water seeping into the =athroom and bedroom The floors in both areas will need to be =eplaced, along with the Bedroom Rug and most probably the bathroom =abinetry All other furnishing have been removed and =laced in Cabana 4 Repair to line is in progress I will forwa
Entities connected to both Condoleezza Rice and the Bedroom Rug