10
Shared Docs
10
Same-Page
10 / 10
Mentions
ent Rich Friday 16th for his review. Memo outlining pond closing procedure from Vendor expected next week. Any concerns please let me know regards Brice please note The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information
Good Morning Attached photo's for your review of EGP Walls and Irrigation RC Separate E mail Photo's of Log, Lodge and MH Landscaping EGP Walls, Tim Oden has pegged out design, attached, irrigation install has started Filling of center circle will start this week, lavender due on site week of the 27th
l_quote" style="margin:0 0 0 .8ex;border-left:lp= tIccc solid;padding-left:lex"> Jeffrey Attached Photo's for your review Will this work? regards Brice On Wed, Mar 30, 2016 at 2:06 PM, jeffrey E. <[email protected] <mailto:[email protected]» wrote: =div dir="ltr">please put rocks where this
s will be , heights and w=dth O= Wed, Mar 30, 2016 at 3:08 PM, Brice Gordon < >=/span> wrote: Jeffrey please attached for your ref=rence </=iv> Tim Oden s=uare off design with fence to the east and existing lavender beds to north= EFTA_R1_01576297 EFTA02467427 The distance from E=isting Lavender b
6' parallel The design will now fit on existing platform with only minor fill at th= North East corner. Are =ou OK with these adjustments regards Brice On Mon, Mar 28, 2016 at 7:25 AM, jeffrey E. =lt;jeevacation@=mail.com <mailto:[email protected]» wrote: call my cell <tel:212%20533%203739> =br
Mar 30, 2016 at 3:08 PM, Brice Gordon &l= > wrote: =div class="gmail_default" style="font-size:small">Jeffrey please attached for your reference Tim Oden square off=design with fence to the east and existing lavender beds to north. The distance from Existing L=vender beds to the NW corner is now 21.73
nate this operation, he will need two guys to assist him Can we proceed? =/div> On Th=, Mar 31, 2016 at 10:57 AM, Brice Gordon < wrote: regards Brice On Wed, M=r 30, 2016 at 2:06 PM, jeffrey E. <[email protected] <mailto:[email protected]» wrote: please put roc=s where this will be , hei
roc=s where this will be , heights and width On Wed, Mar 30, 2016 at 3:08 PM,=Brice Gordon cz wrote: Jeffrey please attached for your reference Tim Oden square off design with fence to th= east and existing lavender beds to north. The distance from Existing Lavender beds to the NW c=rner is now 21.73
wing fill grade requirement Drawings, top and side view showing outline of =roposed work l=t me know if you require any more detail or info regards Brice On Tue, Sep 1, 2015 at 1:50 PM, jeffrey E. <[email protected]<h» wrote: dra= on a piece of paper i dpn't follow O= Tue, Sep 1, 2015 at 12:52 P
Brice Gordon =/span> wrote: Jeffrey attached for your reference are photos showing=the grade stake (GS) at the NE Corner As shown on sketch from Tim Oden the required=amount of fill is 9"4" to meet grade at the NW Corner closet to =H The Plan would be to u=e a lot of rocks and lose rock material for
llel The de=ign will now fit on existing platform with only minor fill at the North Ea=t corner. =/div> Are you OK wit= these adjustments regar=s Brice On Mon, Mar 28, 2016 at 7:25 AM, jeffrey E. <[email protected]<=a» wrote: ca=l my cell? 212 533 3739 <tel:212%20533%203739> On Mon, Mar 28, 20
tached Photo's=for your review On Wed, Mar 30, 2016 at 3:08 PM= Brice Gordon wrote: <=iv class="hS"> Jeffrey please attached for your reference Tim Oden square off design wi=h fence to the east and existing lavender beds to north. The distance from Existing Lavender be=s to the NW corner is now 21.73
9 EFTA02478378 <=iv class="gmail signature"> =rice Gordon Stanley, NM 2 EFTA_R1_01592910 EFTA024
Rich Kahn; Zorro Ranch Subject: ZDC EGP Progress Photo's Jef=rey =div class="gmail_default" style="font-size:small">attached progress ph=tos and Tim Oden sketch of new layout at the EGP for your consideration the bull dozer ar=ived today, work started on forming extended area. regards EGP1=12:4.JPG
o compact the dirt and rebuild the retaining wall at the =E corner, before doing final rough grading at the east end of the existing=garden regards Brice On Fri, D=c 4, 2015 at 10:04 PM, Jeffrey E. <[email protected] <mailto:[email protected]> wrote: this does not =ook right , it is directly ea
t to color. 40 please take more photos of that area. On Fri, D=c 4, 2015 at 8:33 PM, Brice Gordon <-> wr=te: Jeffrey attached progress photos and Tim Oden sketch of new la=out at the EGP for your consideration the bull dozer arrived today, work started on formi=g extended area. regards=/div> href="ht
act the dirt and rebuild the retaining wall at the NE corne=, before doing final rough grading at the east end of the existing garden</=iv> regards Brice On Fri, Dec 4, 2015 a= 10:04 PM, Jeffrey E. <[email protected] <mailto:jeevacation@g=ail.com> wrote: <=lockquote class="gmail_quote" style="margi
olor. please take mo=e photos of that area. On Fri, Dec 4, 2015 at 8:33 PM, B=ice Gordon < Jeffrey <mailto > wrote: attached prog=ess photos and Tim Oden sketch of new layout at the EGP for your considerat=on the bull doz=r arrived today, work started on forming extended area. regards EGP1 12:4.1PG
the NE corner, bef=re doing final rough grading at the east end of the existing garden <=iv class="gmail_default" style="font-size:small"> regards Brice On Fri, Dec 4, 2015 at=10:04 PM, jeffrey E. <[email protected] <mailto:jeevacation@g=ail.com> wrote: =blockquote class="gmail_quote" style="margi
next to color. please =ake more photos of that area. On Fri, De= 4, 2015 at 8:33 PM, Brice Gordon > wro=e: Jeffrey attached progress photos and Tim Oden sketch of new layou= at the EGP for yotg consideration the bull dozer arrived today, work started on forming =xtended area. =br> regards <https:/
Entities connected to both Condoleezza Rice and Tim Oden

Jeffrey Epstein
PERSON
Richard Kahn
PERSON
Marc Rich
PERSONBrice Gordon
PERSON
Jes Staley
PERSON
Oliver Stone
PERSONFence
LOCATIONNorth East
LOCATIONthe North East
LOCATION