6
Shared Docs
6
Same-Page
6 / 6
Mentions
grade out 21. Solutions for generators — no provisions for sound dampening — design fault — Maguire contract will be emailed to Gary, Tom, Darren, Brice for research into the matter — Brice adjusted shutter 22. Fire system — not working, Brice creating fire charts for the island 23. Top of hill — CL
hields and kitchen — Stainless cabinets installed - Back garden 33. Sunken garden berm 34. Concrete roads at flagpole 35. Concrete triangle 36. Compass cement and leveld 37. Bench placements — bench on peninsula point 38. Cabana 1- roof 39. Master bedroom — replace roof screws 4.0lvtasteF-laniiis
Steel shed have estimate for building, budget to be forwarded 31 Jan 11. Triangle, commenced work 12. Entry tree lights, confirmed ground lighting Brice to order 13. Pebble beach - Solar fridge, light, fan for pebble beach. Week of 20th 14. Library Dehumidifaction . week of the 27th 15. 16. Soluti
the month - Dock box pending available time 32. Sunken garden berm continues 33. Concrete roads at flagpole continues 34. Concrete triangle 35. Compass hydroseeded 36. Bench placements — bench on peninsula point 37. Engineering clean up continues 38. New vehicles 39. Dock Decking Samples layed
m - Gutter is leaking in the front corner 5. Flagpole bath and cabana — refrigerator 24" wide, 23" deep, stainless steel, and door swing on right — Brice ordered — robe hook outside shower —pool pump insulation for domestic fresh water distribution pump on order — walkway gates schedule — Bill 6. El
hields and kitchen — Stainless cabinets installed - Back garden 33. Sunken garden berm 34. Concrete roads at flagpole 35. Concrete triangle 36. Compass cement and leveld 37. Bench placements — bench on peninsula point 38. Cabana 1- roof 39. Master bedroom — replace roof screws 41. Engineering -
m - Gutter is leaking in the front corner 5. Flagpole bath and cabana — refrigerator 24" wide, 23" deep, stainless steel, and door swing on right — Brice ordered — robe hook outside shower —pool pump insulation for domestic fresh water distribution pump on order — walkway gates schedule — Bill 6. El
hields and kitchen — Stainless cabinets installed - Back garden 33. Sunken garden berm 34. Concrete roads at flagpole 35. Concrete triangle 36. Compass cement and leveld 37. Bench placements — bench on peninsula point 38. Cabana 1- roof 39. Master bedroom — replace roof screws 41. Engineering -
shed to be laid out - Landscaping — planting Sea grape 14. New vehicles — two more Polaris bikes (800's) - LarryM 15. Dock- - Entry — redo entry — Brice to source dock wood locally - Decking - discuss pressure treated timber/carpeting - Floating Dock — design required - Jet ski Docking - review -
in courtyard) area - requires cement band to continue 30. Relocate Tom's Trailer — area to be used for employee bathrooms 31. Move beach trees 32. Compass — hydroseeded 5/9 33. Sombrero ramp - completed 34. Timers — review installing timers on air conditioners, irrigation water systems, and lights 35
ds to be leveled (Jules) and metal shed to be laid out - Landscaping — planting Sea grape 14. New vehicles — two more Polaris bikes (800's) — Larry/Brice 15. Dock — - Entry— redo entry — Brice to source dock wood locally - Decking - discuss pressure treated timber/carpeting - Floating Dock — design
in courtyard) area - requires cement band to continue 30. Relocate Tom's Trailer — area to be used for employee bathrooms 31. Move beach trees 32. Compass — hydroseeded 5/9 33. Sombrero ramp - completed 34. Timers — review installing timers on air conditioners, irrigation water systems, and lights 35
Entities connected to both Condoleezza Rice and Compass

Jeffrey Epstein
PERSON
Richard Kahn
PERSON
Marc Rich
PERSON
Lesley Groff
PERSON
George W. Bush
PERSONDarren Indyke
PERSON
United States
LOCATIONLeon Black
PERSONDaphne Wallace
PERSON
Julie K. Brown
PERSON
Woody Allen
PERSON
Donald Trump
PERSONDoug Band
PERSON
Samantha Power
PERSON
Bill Clinton
PERSON
Barack Obama
PERSON
Oliver Stone
PERSON
Bella Klein
PERSON
Paul Ryan
PERSON
Bloomberg L.P.
ORGANIZATION