From: "Jeffrey E." <[email protected]> To: Leighton Allenby < >, Richard Kahn Subject: Re: Neptune LLC Construction Costs Date: Mon, 24 Aug 2015 12:28:27 +0000 where is structural repair to roomms ?? On Mon, Aug 24, 2015 at
[email protected]> To: Leighton Allenby < >, Richard Kahn Subject: Re: Neptune LLC Construction Costs Date
I. Awning motor repair 2. AIG Wind Mitigation - two options 3. Window (14) replacement at main house 4. Painting of main, pool and staff house 5. Terrace Restoration 6. Seawall repair 7. Option: New dock with boat lift 8. Draft timeline - draft/will update as projects are approved Please let me know which item
From: Leighton Allenby To: "jeffrey E." <[email protected]> Cc: Richard Kahn Subject: Re: Neptune LLC Construction Costs Date: Mon, 24 Aug 2015 12:33:27 +0000 the engineer is creating a report with a scope of work based on s
"jeffrey E." <[email protected]> Cc: Richard Kahn Subject: Re: Neptune LLC Construction Costs Date
1. Awning motor repair 2. AIG Wind Mitigation - two options 3. Window (14) replacement at main house 4. Painting of main, pool and staff house 5. Terrace Restoration 6. Seawall repair 7. Option: New dock with boat lift 8. Draft timeline - draft/will update as projects are approved Please let me know which item
From: Leighton Allenby To: Jeffrey Epstein <[email protected]> Cc: NYC - Richard Kahn , Leighton Allenby Subject: Neptune LLC Construction Costs Date: Mon, 24 Aug 2015 12:23:11 +0000 Attachments: Neptune_LLC_2015_Construction_Proje
pstein <[email protected]> Cc: NYC - Richard Kahn , Leighton Allenby Subject: Neptune LLC Constru
I. Awning motor repair 2. AIG Wind Mitigation - two options 3. Window (14) replacement at main house 4. Painting of main, pool and staff house 5. Terrace Restoration 6. Seawall repair 7. Option: New dock with boat lift 8. Draft timeline - draft/will update as projects are approved Please let me know which item