7
Shared Docs
7
Same-Page
7 / 7
Mentions
dial — awaiting programming disc — due 4/27 18. Gates - to hide engineering both at top and bottom of h
g floor — completion 5/3 — delayed due to power issues - Silver Polaris - from al relocated to hanger, purchase new vehicle for LSJ 6. Steel Shed — ABC Concepts proposal forwarded to JE 4/24 7. Triangle — needs to be reconfigured, with more dirt on top and less around base Tree from lower road and engineeri
ne on LS1 5/15 to complete with Danny Vicars 18. Gates - Thatch needs to be applied to lower gates - bot
ing in progress - Painting — interior paint selected - Silver Polaris - from LSJ relocated to hanger, purchase new vehicle for LSJ 6. Steel Shed — ABC Concepts proposal forwarded to JE 4/24 — redesign in process 7. Triangle — needs to be reconfigured, with more dirt on top and less around base - more concr
add speed dial - programming disc on LSJ 5/1 18. Gates - Thatch needs to be applied to lower gates — bot
g floor — completion 5/3 — delayed due to power issues - Silver Polaris - from LSJ relocated to hanger, purchase new vehicle for LSJ 6. Steel Shed —ABC Concepts proposal forwarded to JE 4/24 — redesign in process 7. Triangle — needs to be reconfigured, with more dirt on top and less around base - more concr
d dial — awaiting programming disc — due 5/1 18. Gates - Thatch needs to be applied to lower gates — bot
floor — completion 5/3 — delayed due to power issues - Silver Polaris - from LSJ relocated to hanger, purchase new vehicle for LSJ 6. Steel Shed — ABC Concepts proposal forwarded to JE 4/24 — redesign in process 7. Triangle— needs to be reconfigured, with more dirt on top and less around base - more concre
17. Telephone system — remove/add speed dial 18. Gates - Thatch needs to be applied to lower gates — bot
floor — completion 5/3 — delayed due to power issues - Silver Polaris - from LSJ relocated to hanger, purchase new vehicle for LSJ 6. Steel Shed — ABC Concepts proposal forwarded to JE 4/24 — redesign in process 7. Triangle — needs to be reconfigured, with more dirt on top and less around base - more concr
ne on LSJ 5/15 to complete with Danny Vicars 18. Gates - Thatch needs to be applied to lower gates — bot
ing in progress - Painting — interior paint selected - Silver Polaris - from LSJ relocated to hanger, purchase new vehicle for LSJ 6. Steel Shed — ABC Concepts proposal forwarded to JE 4/24 — redesign in process 7. Triangle — needs to be reconfigured, with more dirt on top and less around base - more concr
add speed dial - programming disc on LSJ 5/1 18. Gates - Thatch needs to be applied to lower gates — bot
g floor — completion 5/3 — delayed due to power issues - Silver Polaris - from LSJ relocated to hanger, purchase new vehicle for LSJ 6. Steel Shed —ABC Concepts proposal forwarded to JE 4/24 — redesign in process 7. Triangle — needs to be reconfigured, with more dirt on top and less around base - more concr
Entities connected to both Robert Gates and ABC Concepts

Jeffrey Epstein
PERSON
Marc Rich
PERSONDarren Indyke
PERSON
Condoleezza Rice
PERSON
Abraham Lincoln
PERSONDoug Band
PERSONLarry Visoski
PERSON
White House
ORGANIZATIONKaren
PERSON
Carlos
PERSONCecile de Jongh
PERSONYamaha
ORGANIZATIONJules
PERSONPlantation
LOCATIONMaster Bedroom
PERSONRelocate Tom's Trailer
PERSONGates - Thatch
ORGANIZATIONSombrero
LOCATIONBrice Gordon
PERSONCompass
ORGANIZATION