6
Shared Docs
6
Same-Page
6 / 6
Mentions
ces that can handle the weight of the heavy equipment 18. Library - AC quote forwarded to Rich Barnett, who had design concerns. Plans forwarded to Atlanta 10/30, engineer will answer concerns & develop control designs, EDA 11/16 19. New Employee Bathrooms - research "outhouse "option 20. Gym - Old
ed to approve layout will forward 11/14 - Installation of new bolts — David. Due on site 11/14 25. Equipment/Household Purchase and Delivery - (3) Terex RL-4000 6kW Light Tower systems — 2 on site, 1 remaining to be picked up 11/16 - (1) 2012 John Deere 5101E tractor with 553 loader and 8' blade — ET
ces that can handle the weight of the heavy equipment 18. Library - AC quote forwarded to Rich Barnett, who had design concerns. Plans forwarded to Atlanta 10/30, engineer will answer concerns & develop control designs, EDA 11/16 19. New Employee Bathrooms - research "outhouse "option 20. Gym - Old
ed to approve layout will forward 11/14 - Installation of new bolts — David. Due on site 11/14 25. Equipment/Household Purchase and Delivery - (3) Terex RL-4000 6kW Light Tower systems — 2 on site, 1 remaining to be picked up 11/16 - (1) 2012 John Deere 5101E tractor with 553 loader and 8' blade — ET
ces that can handle the weight of the heavy equipment 18. Library - AC quote forwarded to Rich Barnett, who had design concerns. Plans forwarded to Atlanta 10/30, engineer will answer concerns & develop control designs, EDA 11/28 19. New Employee Bathrooms - research "outhouse "option 20. Gym - New
forwarded to Buck Steel, will follow up this week - Installation of new bolts — 80% complete 25. Equipment/Household Purchase and Delivery - (3) Terex RL-4000 6kW Light Tower systems — on site - (1) 2012 John Deere 5101E tractor with 553 loader and 8' blade — on site - (1) 2003 Genie Z60/34 Boom l
ater drains thru surface, used on St John & St Thomas 16. Library - AC quote forwarded to Rich Barnett, who had design concerns. Plans forwarded to Atlanta 10/30, engineer will answer concerns & develop control designs, ETA 11/16 17. New Employee Bathrooms 18. Gym - New punching bag — installation of
12/4, booked to sail 12/7 - Removal of existing bolts patterns & installation of new - David (carpenter) 23. Equipment Purchase and Delivery - (3) Terex RL-4000 6kW Light Tower systems — at Tropical, sailing 10/31, EDA on STT 11/3 - (1) Skid steer forks — due to arrive at Tropical 10/31 - (1) 2012 J
act Tom Melnick about concrete road construction 11/5 16. Library - AC quote forwarded to Rich Barnett, who had design concerns. Plans forwarded to Atlanta 10/30, engineer will answer concerns & develop control designs, EDA 11/16 17. New Employee Bathrooms 18. aym - New punching bag — installation of
12/4, booked to sail 12/7 - Removal of existing bolts patterns & installation of new - David (carpenter) 23. Equipment Purchase and Delivery - (3) Terex RL-4000 6kW Light Tower systems — EDA on STT 11/3 - (1) Skid steer forks — EDA on STT 11/6 - (1) 2012 John Deere 5101E tractor with 553 loader and
ater drains thru surface, used on St John & St Thomas 17. Library - AC quote forwarded to Rich Barnett, who had design concerns. Plans forwarded to Atlanta 10/30, engineer will answer concerns & develop control designs, ETA 11/16 18. New Employee Bathrooms 19. Gym - New punching bag — installation of
k Steel drawings on site. Shed ordered. Removal of existing bolts patterns & installation of new - David (carpenter) 24. Equipment Purchased - (3) Terex RL-4000 6kW Light Tower systems — due to arrive at Tropical 10/31 - (1) Skid steer forks — due to arrive at Tropical 10/31 - (1) 2012 John Deere 51
Entities connected to both Atlanta and Terex

Jeffrey Epstein
PERSONLeon Black
PERSON
Marc Rich
PERSONEmmy Taylor
PERSON
Condoleezza Rice
PERSONDarren Indyke
PERSON
Samantha Power
PERSONLarry Visoski
PERSON
Oliver Stone
PERSONDaphne Wallace
PERSON
Richard Kahn
PERSON
Martha Stewart
PERSONRichard Barnett
PERSON
Nassau
LOCATIONCecile de Jongh
PERSONStephanie Remington
PERSONNanny Cay
LOCATION
Genie
PERSONLandscaping
PERSONJohn Deere
PERSON