in the lift — Rich to organize. Cummings Metro Power Rich Massage Room Ceiling Ceiling to be paint
n areas under construction. 4. MBR A/C Upgrade: JE approved MBR fan & cooling tower upgrade - revised total of $87,022.66 includes electrical, ABB Drive, & engineering fees (with design plans for chiller). Awaiting cost for adding a separate control panel for Landis to hook system up to BMS — proposal expected by Nov 1
8 batteries are still on order. Cummings Metro Power 11/7 4 EFTA00577482 ESTATE PROGRESS REPORT —
n areas under construction. 4. MBR A/C Upgrade: JE approved MBR fan & cooling tower upgrade - revised total of $87,022.66 includes electrical, ABB Drive, & engineering fees (with design plans for chiller). Awaiting cost for adding a separate control panel for Landis to hook system up to BMS — proposal expected by Nov 1
in the lift — Rich to organize. Cummings Metro Power Rich Massage Room Ceiling Ceiling to be paint
n areas under construction. 4. MBR A/C Upgrade: JE approved MBR fan & cooling tower upgrade - revised total of $87,022.66 includes electrical, ABB Drive, & engineering fees (with design plans for chiller). Awaiting cost for adding a separate control panel for Landis to hook system up to BMS — proposal expected by Nov 1
Entities connected to both Samantha Power and Drive, & engineering fees

Jeffrey Epstein
PERSONLeon Black
PERSON
Ghislaine Maxwell
PERSON
Marc Rich
PERSON
New York
LOCATION
Eric Trump
PERSONMaria Farmer
PERSON
David Rodgers
PERSON
Clark
PERSON
Solomon
PERSON
Cassidy
PERSONSerge
PERSONNicholas
PERSON
Cabana
LOCATIONPinto
PERSON
Alberto
PERSON
Paris
LOCATIONPascal
PERSON
Italy
LOCATIONProject Solutions
ORGANIZATION