ght, estimate= we also need to do engine runs for Power Distribution Check's as w=ll, If all goes well,
leave at 12 . or 1&n=sp; On Sat, Jan 1=, 2019 at 6:55 PM Larry Visoski < wrote: Jeffrey Appears the #16 Pin that was bent is able to be re-used, Avioincs straighten=the Female portion, on the bench, the pin locks into place now. They will re-assemble the PDB Rack and complete ops checks, to guaranty
ght, estim=te, we also need to do engine runs for Power Distribution Check's =s well, If all goes well,
ave at 12 . or 1 <=div> On Sat, Jan 12, 2019 a= 6:55 PM Larry Visoski <-» wrote: J=ffrey Appears the #16 Pin that was bent is able to be re-used, Avioincs straighter the Female portion, on the bench, the pin locks into place now. They will re-assemble the PDB Rack and complete ops checks, to guaranty
ght, estim=te, we also need to do engine runs for Power Distribution Check's =s well, If all goes well,
Re: 550 update ok thx On Sat, Jan 12, 2019 at 6:55 PM Larry Visoski <-> wrote: Jeffrey Appears the #16 Pin that was bent is able to be re-used, Avioincs straighte= the Female portion, on the bench, the pin locks into place now. They will re-assemble the PDB Rack and complete ops checks, to guaranty
ght, estimate, we also n=ed to do engine runs for Power Distribution Check's as well, If all goes well,
Sent: Saturday, January 12, 2019 11:56 PM To: Je vacation Subject: 550 update Jeffrey Appears the #16 Pin that was bent is able to be re-used, Avioincs straighten=the Female portion, on the bench, the pin locks into place now. They will re-assemble the PDB Rack and complete ops checks, to guaranty
Entities connected to both Samantha Power and Avioincs