6
Shared Docs
6
Same-Page
6 / 6
Mentions
Hrs 334 01 Jun 2016 01 1.0 292502 Airframe Power Transfer Unit Manifold Differential Pressure Indi
ons External (Left) - Zonal Inspection G550 AMM Special Inspection (R) 48 MOS 0.0 0 27 Jun 2013 30 Jun 2017 11 Mos 48 4.0 541006 Airframe Pylons External (Right) - Zonal Inspection G550 AMM Special Inspection (R) 48 MOS 0.0 0 27 Jun 2013 30 Jun 2017 11 Mos 48 4.0 541010 Airframe Pylons Inte
ur Window) 23 20 Jun 2013 17 Mar 2014 292502 Power Transfer Unit Manifold Differential G550 AMM 50
s - Detailed Inspection 05.20.00 711 Notes: (End of Month Item] (1 MOS Window] 12 30 May 2008 48 MOS 19 Apr 2012 30 Apr 2016 15 Mos 541005 Pylons External (Left) Zonal Inspection G550 AMM 2354.6 * Airframe MAN 05.2000 711 Mfg#: 5450-00 Notes: [End of Month Item] [1 MOS Window] 31 Aug 2003 48
14 31 Jul 2016 5 Mos 240122 Emergency Battery Power System (Right) 6550 AMM 2320.2 * Airframe MA
iDate Next Due ("=Adj) Remaining Hrs/CycfCal Logbook I App Serial Number Section Page Mfg Ref Number Notes Revision Date Issued 541005 Pylons External (Left) • Zonal inspection * Airframe MAN Mfg#: 54-50-00 Notes: (End of Month item] (1 MOS Window] 6550 AMM 05.20.00 1605.6 621 31 Aug 2003
14 31 Jul 2016 5 Mos 240122 Emergency Battery Power System (Right) 6550 AMM 2320.2 * Airframe MA
iDate Next Due ("=Adj) Remaining Hrs/CycfCal Logbook I App Serial Number Section Page Mfg Ref Number Notes Revision Date Issued 541005 Pylons External (Left) • Zonal inspection * Airframe MAN Mfg#: 54-50-00 Notes: (End of Month item] (1 MOS Window] 6550 AMM 05.20.00 1605.6 621 31 Aug 2003
26 Nov 2007 2.00 710025 Engine Test 4 Engine Power Assurance Check Engine 1 71.00.00 1920.2 Hrs
terface - Detailed Inspection 53.00.00 [End of Month Item] [1 MOS Window] 72 MOS 2849.4 Hrs 833 CiL 10 Apt 2013 30 Apt 2019 541005 Airframe Pylons External (Left) Zonal Inspection 54.50.00 [End of Month Item] [1 MOS Window] 48 MOS 2354.6 Hrs 711 CI_ 19 Apt 2012 30 Apt 2016 4.00 541006 Airframe
11 Feb 2013 2.00 710025 Engine Test 4 Engine Power Assurance Check Engine 1 71.00.00 440.3 Hrs 1
d Inspection 53.00-00 72 Added at Rev 24. [End of Month Item) [1 MOS Window) 72 MOS 0.0 Hrs 0 CtL 27 Jun 2013 30 Jun 2019 541005 Airframe Pylons External (Left) Zonal Inspection 54-5000 48 [End of Month Item) [I MOS Window) 48 MOS 0.0 Hrs 0 CI_ 27 Jun 2013 30 Jun 2017 4.00 541006 Airframe P
Entities connected to both Samantha Power and Pylons External
General Dynamics Company
ORGANIZATIONWing Rear Beam
ORGANIZATIONCowl Doors
ORGANIZATIONTSNMO
ORGANIZATIONFirst Aid Kit
ORGANIZATIONOps Number(s
ORGANIZATIONRudder Control
ORGANIZATIONTrim Cables
ORGANIZATIONAileron Control
ORGANIZATIONAvg Manhours
PERSONPylons Internal (Left
ORGANIZATIONFuel Shut
PERSONMain Landing Gear Corrosion
ORGANIZATIONAir Turbine Starter Oil - Change
ORGANIZATIONPower Transfer Unit
ORGANIZATIONEmpennage FS
ORGANIZATIONMain Fuel Boost Pump
ORGANIZATIONService Life
ORGANIZATIONElevator Skins
ORGANIZATIONNDT Inspection
ORGANIZATION