3
Shared Docs
3
Same-Page
3 / 3
Mentions
.842.80 4.0 240121 Airframe Emergency Battery Power System (Left) - Operational Test 12 MOS 7109.1
3A Airframe No NSN Replacement (X) 6766.9 0.0 0 0 1686 12 MOS 08 Mar 2014 08 Mar 2015 27 Days Expiration $81.95 1.0 261159 Airframe Fire Detection Rail Assembly No. 4 (Left) Discard 51291-197 No GV AMM 98.05.0447 Replacement (X) 0.0 0.0 0 0 2000 Cycknd 0 2000 Cycknd 208 Cycknd 15 Apr 1999 2.0 2
13 Airframe 23.15.01 for O310229 232103 High Power Amplifier Removal / Installation 0.0 2354.6 Hrs
rs 11 CiL 09 Apt 2008 1.00 261146 Engine Fire and Heat Sensing (Right) Functional Test Airframe 26.11.00 20.7 Hrs 11 C/L 09 Apt 2008 1.00 Fire Detection Rail Assembly No. 5 (Left) - Removal r 261151 0.0 0.0 Hrs Installation 51291-196 07.08.9289 0 0 CA_ No 0 26 Nov 2007 Airframe 26.11.15 2.00 20734.64
0 28 Nov 2015 Airframe 23.15.01 232103 High Power Amplifier Removal / Installation 0.0 0.0 Hrs 1
6 Hrs 4 CI_ 14 Jun 2013 1.00 261146 Engine Fire and Heat Sensing (Right) Functional Test Airframe 26.11.00 9.6 Hrs 4 CtL 14 Jun 2013 1.00 Fire Detection Rail Assembly No. 5 (Left) - Removal r 261151 0.0 0.0 Hrs Installation 51291-196 12.104898 0 0 OL No 0 11 Feb 2013 Airframe 26.11.15 2.00 15838.4988
Entities connected to both Samantha Power and Fire Detection Rail Assembly
VALVE
ORGANIZATIONTSNMO
ORGANIZATIONOps Number(s
ORGANIZATIONFirst Aid Kit
ORGANIZATIONAvg Manhours
PERSONAl Rights Reserved
ORGANIZATIONApprox Prier
PERSONSHERWIN WILLIAMS
ORGANIZATIONAir Turbine Starter Oil - Change
ORGANIZATIONForward Cabin
PERSONCyciLnd
ORGANIZATIONCycilnd
PERSONAC Power
ORGANIZATIONAir Supply
ORGANIZATIONBaggage Compartment Ventilation Check
ORGANIZATIONL Wing Static Wicks / Bonding Functional Test
ORGANIZATIONPersonal Breathing Equipment (No.
ORGANIZATIONTime Limited Supplies - Discard
ORGANIZATIONSUBWOOFER
ORGANIZATIONEquipment Overheat Thermal Switch
ORGANIZATION