3
Shared Docs
3
Same-Page
3 / 3
Mentions
00 Discrepancy: 40.56 CMP 6550 491301 Auxiliary Power Unit Turbine Plenum Drains - Operational Test Fo
n Billing Method I lours Rate Total Labor USD: Flat Rate 5152.00 Total USD: 5152.00 Discrepancy: 4038 CMP G550 282629 Engine Fuel Shut-off Valve (Left) - Operational Check Resolution: COMPLIED WITH ChIP G550 282629 Engine Fuel Shut-off Valve (Left) - Operational Check Billing Method Hours Rate Tot
e IF frequencies to Ka-band frequencies. A High- Power Amplifier (IIPA) increases the signal strength fo
illing Method Hours Rate Total Labor USD: Flat Rale 5152.00 Total USD: 5152.00 Discrepancy: 40.40 CMP 6550 291501 Hydraulic System Shut-off Valve (Left) - Operational Test Resolution: COMPLIED WITH CMP G550 291501 Hydraulic System Shut-off Valve (Left) - Operational Test Billing Method Hours Rate T
Hrs 334 01 Jun 2016 01 1.0 292502 Airframe Power Transfer Unit Manifold Differential Pressure Indi
ctional Check G550 AMM FunctionaVOps Test (F) 48 MOS 0.0 0 27 Jun 2013 30 Jun2017 11 Mos 04 2.0 291501 Airframe Hydraulic System Shut-off Valve (Left) - Operational Test G550 AMM Functional/Ops Test (0) 24 MOS 726.9 242 12 May 2015 30 Jun 2017' 11 Mos 02 2.0 291502 Airframe Hydraulic Syste
Entities connected to both Samantha Power and Valve (Left) -
Leon Black
PERSON
Julie K. Brown
PERSON
Prince Charles
PERSONDoug Band
PERSONLarry Visoski
PERSON
Adriana Ross
PERSON
Courtney Love
PERSONVALVE
ORGANIZATIONGulfstream
ORGANIZATIONFILTER
ORGANIZATION
Savannah
LOCATIONCowl Doors
ORGANIZATIONTrim Cables
ORGANIZATIONRudder Control
ORGANIZATIONAileron Control
ORGANIZATIONFuel Shut
PERSONModem
ORGANIZATIONInlet Areas
LOCATIONSOLENOID
ORGANIZATIONCOTTER
ORGANIZATION