3
Shared Docs
3
Same-Page
3 / 3
Mentions
00 Discrepancy: 40.56 CMP 6550 491301 Auxiliary Power Unit Turbine Plenum Drains - Operational Test Fo
satellites in various orbits to enable beyond lineof- sight communications between airborne, ground fixed, and ground transportable terminals. The Radome will be removed and replaced by a new Ka-band capable radome. Certification: The Jet ConneX (Ka-band) High-Speed Data System along with the Satcom D
e IF frequencies to Ka-band frequencies. A High- Power Amplifier (IIPA) increases the signal strength fo
satellites in various orbits to enable beyond lineof- sight communications between airborne, ground fixed, and ground transportable terminals. The Radome will be removed and replaced by a new Ka-band capable radome. Certification: The Jet ConneX (Ka-band) High-Speed Data System along with the Satcom D
he IF frequencies to Ka-band frequencies. A High- Power Amplifier (HPA) increases the signal strength for
satellites in various orbits to enable beyond line- of-sight communications between airborne, ground fixed, and ground transportable terminals. The Radome will be removed and replaced by a new Ka-band capable radome. One (1) SDR will be installed in the aft baggage and interlaced with the existing airc
Entities connected to both Samantha Power and Radome

Jeffrey Epstein
PERSONLeon Black
PERSON
Julie K. Brown
PERSON
Prince Charles
PERSONDoug Band
PERSONLarry Visoski
PERSON
Honeywell
ORGANIZATION
Adriana Ross
PERSON
Courtney Love
PERSONVALVE
ORGANIZATIONGulfstream
ORGANIZATIONFILTER
ORGANIZATION
Savannah
LOCATIONTrim Cables
ORGANIZATIONCowl Doors
ORGANIZATIONAileron Control
ORGANIZATIONRudder Control
ORGANIZATIONModem
ORGANIZATIONFuel Shut
PERSONSOLENOID
ORGANIZATION