3
Shared Docs
3
Same-Page
3 / 3
Mentions
Breaker Panel EFTA00804987 Library Shut Down Power at Circuit breaker Panel Secure all doors, insta
Panel Close Down Shutters Engineering All Equipment Operational and Fueled Skid Steer and Lull To Tunnel #2 Lull GSJ Swimming pools Close all Valves and Shut Down Pumps Half Empty Pools Propane Close all valves on manifold and main valves Shut Down Circuit Breaker Panel EFTA00804987 Library
.01 verified by PO619 26 Nov 2007 275201 Flap Power Drive Unit Removal / Installation 0.0 0.0 Hrs
7 Fuel Ejector Pump and Check Valves (Left) - Inspection 0.0 Hrs 2.00 Airframe 28.26.07 0 CI_ 26 Nov 2007 282628 Fuel Ejector Pump and Check Valves (Right) • Inspection 0.0 Hrs 2.00 Airframe 28.26.07 0 CI_ 26 Nov 2007 282629 Engine Fuel Shut-off Valve (Left) Operational Check 3307.8 Hrs
0 11 Feb 2013 Airframe 27.51.01 275201 Flap Power Nye Unit - Removal / Installation 0.0 0.0 Hrs
27 Fuel Ejector Pump and Check Valves (Left) - Inspection 0.0 Hrs 2.00 Airframe 28.26.07 0 C& 11 Feb 2013 282628 Fuel Ejector Pump and Check Valves (Right) • Inspection 0.0 Hrs 2.00 Airframe 28.26.07 0 CtL 11 Feb 2013 282629 Engine Fuel Shut-off Valve (Left) Operational Check 726.9 Hrs
Entities connected to both Samantha Power and Valves

Jeffrey Epstein
PERSON
Marc Rich
PERSON
Richard Kahn
PERSONLarry Visoski
PERSON
North America
LOCATIONVALVE
ORGANIZATIONFILTER
ORGANIZATIONGeneral Dynamics Company
ORGANIZATIONWing Rear Beam
ORGANIZATIONTSNMO
ORGANIZATIONOps Number(s
ORGANIZATIONAvg Manhours
PERSONTrim Cables
ORGANIZATIONRudder Control
ORGANIZATIONAileron Control
ORGANIZATIONFuel Shut
PERSONMain Fuel Boost Pump
ORGANIZATIONForward Cabin
PERSONSpare Squib
PERSONLongitudinal Control System Friction
ORGANIZATION