3
Shared Docs
3
Same-Page
3 / 3
Mentions
go to NY & LSJ. JE to advise if Sally JE Marc / Eric JE & Michael are to be trained & if are to go
n areas under construction. 4. MBR A/C Upgrade: JE approved MBR fan & cooling tower upgrade - revised total of $87,022.66 includes electrical, ABB Drive, & engineering fees (with design plans for chiller). Awaiting cost for adding a separate control panel for Landis to hook system up to BMS — proposal expected by Nov 1
servers are being installed on Dec 1. JE Marc / Eric Conference Room Jeff Schantz's room to be turned
n areas under construction. 4. MBR A/C Upgrade: JE approved MBR fan & cooling tower upgrade - revised total of $87,022.66 includes electrical, ABB Drive, & engineering fees (with design plans for chiller). Awaiting cost for adding a separate control panel for Landis to hook system up to BMS — proposal expected by Nov 1
servers are being installed on Dec 1. JE Marc / Eric JE Conference Room Jeff Schantz's room to be tu
n areas under construction. 4. MBR A/C Upgrade: JE approved MBR fan & cooling tower upgrade - revised total of $87,022.66 includes electrical, ABB Drive, & engineering fees (with design plans for chiller). Awaiting cost for adding a separate control panel for Landis to hook system up to BMS — proposal expected by Nov 1
Entities connected to both Eric Trump and Drive, & engineering fees

Jeffrey Epstein
PERSON
Ghislaine Maxwell
PERSON
Marc Rich
PERSONLeon Black
PERSONMaria Farmer
PERSON
Samantha Power
PERSON
New York
LOCATION
David Rodgers
PERSON
Clark
PERSON
Solomon
PERSON
Cassidy
PERSONNicholas
PERSON
Italy
LOCATIONPascal
PERSONPinto
PERSONSerge
PERSON
Alberto
PERSON
Cabana
LOCATIONLarry M
PERSON
Paris
LOCATION