From: Eric Roth Sent: Monday,11.... To: jeffrey E. Cc:
Cc: Richard Kahn Subject: galleys and lay vanity Jeffrey, FYI - I have my lead engineer flying i= tomorrow for us to go through the aft R/H and L/H galley and lavatory mod= to get an accurate handle on labor hours and engineering costs so that I can start to finalize our numbers.<=span> Best Regards,
om> Sent: Saturday, July 8, 2017 12:12 PM To: Eric Roth Subject: Re: FW: Work Scope to be accompli
= recovering what is there — they require engineering and certifica=ion. Lastly, with regard to the removal of =he overn and coffee maker in the aft L/H galley, removing them is relative=y simple; it's the close outs, adjustable shelving, engineering and certification that takes time. EFTA_R1_01878786 EFT
From: Eric Roth Sent: Thursday, April 27, 2017 1:29 PM To
dering long lead time items such as the wood veneer — 2 plus weeks to manufacture) 3. Define "open areas" (Aft lavatory walls, potty seat, vanity, L/H galley, etc.) Items to put us on track for a successful refurbishment When do you envision signing the contract? (Today would be a pretty good day to do s
From: Eric Roth Sent: Thursday, April 27, 2017 1:17 PM To
dering long lead time items such as the wood veneer — 2 plus weeks to manufacture) 3. Define "open areas" (Aft lavatory walls, potty seat, vanity, L/H galley, etc.) Items to put us on track for a successful refurbishment When do you envision signing the contract? (Today would be a pretty good day to do s
From: Eric Roth Sent: Thursday, April 27, 2017 1:02 PM To
dering long lead time items such as the wood veneer — 2 plus weeks to manufacture) 3. Define "open areas" (Aft lavatory walls, potty seat, vanity, L/H galley, etc.) Items to put us on track for a successful refurbishment When do you envision signing the contract? (Today would be a pretty good day to do s