3
Shared Docs
3
Same-Page
3 / 3
Mentions
ice Number: Step: 15.53.1 Completed Remove gap band 2I-LE-4 ansd center section leading edge from air
corrosion and pitting from panel opening mounting flange of panel 38-UPR-5, cadmium plated exposed surface and applied coat of primer. All work done IAW GIV SRM 51-13-10. Billing Method Hours Rate Total Labor USD: Time and Material ST 733 @ $118.00 $864.94 Labor USD: Time and Material OT 0.10
ice USD Extended USD NAS1922-0275-3 CLAMP,HOSE,BAND,TANGENTIAL WORM,LGT WT 1.000 $6.54 $6.54 Item
BOARD SIDE. ALL WORK DONE IAW GIV SRM 51-13-21. STEP: 3 COMPLETED CORROSION REMOVAL OF LEFT WING B TRACK INBOARD AND OUTBOARD SIDES. ALL WORK DONE IAW GIV SRM 51-13-21. STEP: 4 REMOVED CORROSION ON LEFT WING D TRACK INBOARD AND OUTBOARD SIDES. ALL WORK DONE IAW GIV SRM 51-13-21. STEP: 5 REMOVED CORROSION
ice USD Extended USD NASI922-0275-3 CLAMP,HOSE,BAND,TANGENTIAL WORM,LGT WT 1.000 $6.54 $6.54 Item
ION BY HAND ON AFT INBOARD RH WHE EL WELL FLANGE. ALODINE BARE SURFACES. TOUCHED UP WITH EPDXY PRIMER AND FLUID RESISTANT WHITE PAINT. ALL WORK DONE IAW GIV SRM 51-13 -10 AND 51-07-10. Billing Method Labor USD Time & Material ST Parts USD Time & Material Totals USD Parts: Hours Rate Total 26.400
Entities connected to both Doug Band and IAW GIV SRM

Ghislaine Maxwell
PERSON
George W. Bush
PERSON
Samantha Power
PERSON
Prince Charles
PERSON
Stephen Hawking
PERSON
Dallas
LOCATION
Adriana Ross
PERSONJEGE, Inc.
ORGANIZATION
Savannah
LOCATIONAVIONICS
ORGANIZATIONCOTTER
ORGANIZATIONDetail Subtotal USD
PERSONSEMKIT
ORGANIZATIONGIV AMM
PERSONROLLER
ORGANIZATIONRDC HEX
ORGANIZATIONRIVET
ORGANIZATIONGIV CMP
ORGANIZATIONDUELIST REVIEW
ORGANIZATIONNUTCRACKER
ORGANIZATION