7
Shared Docs
7
Same-Page
7 / 7
Mentions
Nautilus (Main courtyard) area - requires cement band to continue 30. Relocate Tom's Trailer — area to
erial & holes in stone wall need to be added for water drainage — holes complete, road grading after Five Palms 28. Outside Master Bedroom — banana Plantation area requires tidying up — 4/30 - bedroom door to outside to be adjusted and lock added 29. Nautilus (Main courtyard) area - requires cement band t
2012 C0nTrilg0il a 00 76803 .3.P.,;;7,,..,t,•'‘ Band Traits Plea Nary Ann- < + COIMISSION NUMBERJEX
e particularly described as: Lauderdale Shores Reamem Plat Lot 22 Blk 5 with a Folio Number of 5042 12 13 0380; (RP10)10630 ? le Street, Apt. 110, Plantation, Florida, hereafter also referred to as T or ' fend t RHO," includes that portion of the condominium/townhome, vements, fixtures, attachments and
Nautilus (Main courtyard) area - requires cement band to continue 31. Relocate Tom's Trailer — area to
rains 27. Gym Road - road material & holes in stone wall need to be added for water drainage — work continues 28. Outside Master Bedroom — banana Plantation area requires tidying up — 4/30 - bedroom door to outside to be adjusted and lock added 29. Entry basket — bougainvillea to be purchased for Basket
Nautilus (Main courtyard) area - requires cement band to continue 31. Relocate Tom's Trailer — area to
rains 27. Gym Road - road material & holes in stone wall need to be added for water drainage — work continues 28. Outside Master Bedroom — banana Plantation area requires tidying up — 4/30 - bedroom door to outside to be adjusted and lock added 29. Entry basket — bougainvillea to be purchased for Basket
Nautilus (Main courtyard) area - requires cement band to continue 31. Relocate Tom's Trailer — area to
t rains 27. Gym Road - road material & holes in stone wall need to be added for water drainage — work continues 28. Outside Master Bedroom — banana Plantation area requires tidying up — 4/30 - bedroom door to outside to be adjusted and lock added 29. Entry basket — bougainvillea to be purchased for Basket
Nautilus (Main courtyard) area - requires cement band to continue 30. Relocate Tom's Trailer — area to
erial & holes in stone wall need to be added for water drainage — holes complete, road grading after Five Palms 28. Outside Master Bedroom — banana Plantation area requires tidying up — 4/30 - bedroom door to outside to be adjusted and lock added 29. Nautilus (Main courtyard) area - requires cement band t
Nautilus (Main courtyard) area - requires cement band to continue 31. Relocate Tom's Trailer — area to
rains 27. Gym Road - road material & holes in stone wall need to be added for water drainage — work continues 28. Outside Master Bedroom — banana Plantation area requires tidying up — 4/30 - bedroom door to outside to be adjusted and lock added 29. Entry basket — bougainvillea to be purchased for Basket
Entities connected to both Doug Band and Plantation

Jeffrey Epstein
PERSON
Ghislaine Maxwell
PERSONLeon Black
PERSON
George W. Bush
PERSON
Lesley Groff
PERSON
Marc Rich
PERSON
United States
LOCATION
Bill Clinton
PERSON
Donald Trump
PERSON
Prince Andrew
PERSON
Alan Dershowitz
PERSON
Condoleezza Rice
PERSON
Samantha Power
PERSON
Oliver Stone
PERSON
Julie K. Brown
PERSON
Joe Biden
PERSON
Prince Charles
PERSONCourtney Wild
PERSONMaria Farmer
PERSON
Eric Trump
PERSON