3
Shared Docs
3
Same-Page
3 / 3
Mentions
ivery. Dupont delay Blackout Update Since the Black Out the following Emergency Systems have been ch
n areas under construction. 4. MBR A/C Upgrade: JE approved MBR fan & cooling tower upgrade - revised total of $87,022.66 includes electrical, ABB Drive, & engineering fees (with design plans for chiller). Awaiting cost for adding a separate control panel for Landis to hook system up to BMS — proposal expected by Nov 1
ivery. Dupont delay Blackout Update Since the Black Out the following Emergency Systems have been ch
n areas under construction. 4. MBR A/C Upgrade: JE approved MBR fan & cooling tower upgrade - revised total of $87,022.66 includes electrical, ABB Drive, & engineering fees (with design plans for chiller). Awaiting cost for adding a separate control panel for Landis to hook system up to BMS — proposal expected by Nov 1
ivery. Dupont delay Blackout Update Since the Black Out the following Emergency Systems have been ch
n areas under construction. 4. MBR A/C Upgrade: JE approved MBR fan & cooling tower upgrade - revised total of $87,022.66 includes electrical, ABB Drive, & engineering fees (with design plans for chiller). Awaiting cost for adding a separate control panel for Landis to hook system up to BMS — proposal expected by Nov 1
Entities connected to both Leon Black and Drive, & engineering fees

Jeffrey Epstein
PERSON
Marc Rich
PERSON
Ghislaine Maxwell
PERSON
Eric Trump
PERSONMaria Farmer
PERSON
Samantha Power
PERSON
New York
LOCATION
David Rodgers
PERSON
Clark
PERSON
Solomon
PERSON
Cabana
LOCATION
Cassidy
PERSONNicholas
PERSONPinto
PERSON
Italy
LOCATION
Paris
LOCATIONPascal
PERSONSerge
PERSON
Landis
PERSON
Alberto
PERSON