3
Shared Docs
3
Same-Page
3 / 3
Mentions
one more potential site and will be meeting with Clinton Hedrington of VIWAPA this week to work out their
ill they be maintained. 5.02 Exhibits and Drawings: This project will require full sized drawings as well as drawing at an 8.5 x 11 format for the USACOE application. The USACOE drawings will need to include both profile drawing as well as site plan drawings. These drawings will need to be provided by
ral years to look at impact. I know you spoke to Clinton Hedrington and he spoke to me about the cable. I
ill they be maintained. 5.02 Exhibits and Drawings: This project will require full sized drawings as well as drawing at an 8.5 x 11 format for the USACOE application. The USACOE drawings will need to include both profile drawing as well as site plan drawings. These drawings will need to be provided by
irst several years to look at impact. I spoke to Clinton Hedrington and told him it was imperative that VI
will they be maintained 5.02 Exhibits and Drawings: This project will require full sized drawings as well as drawing at an 8.5 x 11 format for the USACOE application. The USACOE drawings will need to include both profile drawing as well as site plan drawings. These drawings will need to be provided by
Entities connected to both Bill Clinton and USACOE

Jeffrey Epstein
PERSON
Paul Ryan
PERSON
Sarah Ferguson
PERSON
San Juan
LOCATIONUtilities
ORGANIZATIONErika Kellerhals
PERSONAmy Claire Dempsey
PERSON
St. Croix
LOCATIONClinton Hedrington
PERSONBioimpact, Inc.
ORGANIZATIONFerguson Kroblin
PERSON
Coastal
LOCATION
David Brewer
PERSONVIWAPA
ORGANIZATIONAir Quality
ORGANIZATIONthe Coastal Zone
LOCATIONTerrestrial Resources
ORGANIZATIONLandforms, Geology, Soils
ORGANIZATIONHistoric Land
LOCATIONGreat Bay
LOCATION