3
Shared Docs
3
Same-Page
3 / 3
Mentions
one more potential site and will be meeting with Clinton Hedrington of VIWAPA this week to work out their
however that this should be kept to a minimum. The offshore work will require sediment control devices for the construction work 5.01f Schedule for Construction Activities & Implementation of Sediment Control Measures: We will need to present the detailed schedule of each construction activity and subsequent activity. This does not have to be actual date
ral years to look at impact. I know you spoke to Clinton Hedrington and he spoke to me about the cable. I
however that this should be kept to a minimum. The offshore work will require sediment control devices for the construction work 5.011Schedule for Construction Activities & Implementation of Sediment Control Measures: We will need to present the detailed schedule of each construction activity and subsequent activity. This does not have to be actual date
irst several years to look at impact. I spoke to Clinton Hedrington and told him it was imperative that VI
however that this should be kept to a minimum. The offshore work will require sediment control devices for the construction work 5.01f Schedule for Construction Activities & Implementation of Sediment Control Measures: We will need to present the detailed schedule of each construction activity and subsequent activity. This does not have to be actual date
Entities connected to both Bill Clinton and Construction Activities & Implementation of Sediment Control

Jeffrey Epstein
PERSON
Paul Ryan
PERSON
Sarah Ferguson
PERSON
San Juan
LOCATIONUtilities
ORGANIZATIONErika Kellerhals
PERSONAmy Claire Dempsey
PERSON
St. Croix
LOCATIONClinton Hedrington
PERSONBioimpact, Inc.
ORGANIZATIONFerguson Kroblin
PERSON
Coastal
LOCATION
David Brewer
PERSONVIWAPA
ORGANIZATIONAir Quality
ORGANIZATIONthe Coastal Zone
LOCATIONTerrestrial Resources
ORGANIZATIONLandforms, Geology, Soils
ORGANIZATIONHistoric Land
LOCATIONGreat Bay
LOCATION