5
Shared Docs
5
Same-Page
5 / 5
Mentions
tall new RO equipment to meet this goal. will be forwarding water anylais to TSG USVI to confirm use of container RO at Zorro. Brie Gordon Little Saint James USVI Phone: EFTA_R1_00219273 EFTA01837626
ix with wells 4 and B. the ratio is approx 1/3 dakota to 2/3 B and 4 Water. One Correction the present extenision of time to appropriate 25% of the Dakota permit is now Jan 15 2014, Zorro would need to drill a new well and install new RO equipment to meet this goal. will be forwarding water anylais t
all new RO equipment to meet this goal. will be forwarding water anylais to TSG USVI to confirm use of container RO at Zorro. Brice Gordon Little Saint James USVI Phone: The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside informatio
ix with wells 4 and B. the ratio is approx 1/3 dakota to 2/3 B and 4 Water. One Correction the present extenision of time to appropriate 25% of the Dakota permit is now Jan 15 2014, Zorro would need to drill a new well and install new RO equipment to meet this goal. will be forwarding water anylais t
will be over 2 miles from existing = phase service to new well location. do you still wish me to estimate cost to run 3 phase? Brice Gordon Little Saint James USVI Phone: 1 EFTA_R1_02059599 EFTA02698668
May 24, 2012 6:38 PM To: Jeffrey Epstein Cc: Craig Martin Subject: Well 3 Phase FYI attached map shows location of existing 3 phas= power at Dakota Well, my initial response was way off in terms of distanc= taking into account topography it will be over 2 miles from existing = phase service to n
will be over 2 miles from existing 3 phase service to new well location. do you still wish me to estimate cost to run 3 phase? Brice Cordon Little Saint James USVI Phone: The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside informatio
[email protected]> wrote: cost On Thu, May 24, 2012 at 8:38 PM, brice gordon < wrote: FYI attached map shows location of existing 3 phase power at Dakota Well, my initial response was way off in terms of distance taking into account topography it will be over 2 miles from existing 3 phase service to
ic Services, Inc. Albuquerque, NM 87199-4716 NM License No. Casey W. Cook, P.E. Balleau Groundwater Inc itatiouJEZIYA . I Brice Gordon Little Saint James USVI Phone www a eau com EFTA_R1_00299004 EFTA01884362 Brice Gordon Little Saint James USVI Phonc Brice Gordon Little Saint James USVI
l.com> Single phase power already at sight therefore 100 gpm pump 6 inch casing Anything bigger will require 3 phase power 3 phase only at existing Dakota well 3 week lead time Would use existing infrastructure Controls, power etc to keep cost down Will need to lay electric and pipe 800 ft To connect
Entities connected to both Saint James and Dakota

Jeffrey Epstein
PERSONBrice Gordon
PERSON
Marc Rich
PERSON
Richard Kahn
PERSON
Condoleezza Rice
PERSON
Ghislaine Maxwell
PERSONDarren Indyke
PERSON
U.S. Virgin Islands
LOCATION
George W. Bush
PERSONLarry Visoski
PERSON
New York
LOCATION
Sarah Kellen
PERSONLeon Black
PERSONDaphne Wallace
PERSON
Zorro
LOCATION
United States
LOCATION
Lesley Groff
PERSON
Palm Beach
LOCATIONthe Southern District
LOCATION
Virginia Giuffre
PERSON