ar phone line needs to be installed in the lift — Rich to organize. Cummings Metro Power Rich Massa
n areas under construction. 4. MBR A/C Upgrade: JE approved MBR fan & cooling tower upgrade - revised total of $87,022.66 includes electrical, ABB Drive, & engineering fees (with design plans for chiller). Awaiting cost for adding a separate control panel for Landis to hook system up to BMS — proposal expected by Nov 1
ar phone line needs to be installed in the lift — Rich to organize. Rich Massage Room Ceiling Ceili
n areas under construction. 4. MBR A/C Upgrade: JE approved MBR fan & cooling tower upgrade - revised total of $87,022.66 includes electrical, ABB Drive, & engineering fees (with design plans for chiller). Awaiting cost for adding a separate control panel for Landis to hook system up to BMS — proposal expected by Nov 1
ar phone line needs to be installed in the lift — Rich to organize. Cummings Metro Power Rich Massa
n areas under construction. 4. MBR A/C Upgrade: JE approved MBR fan & cooling tower upgrade - revised total of $87,022.66 includes electrical, ABB Drive, & engineering fees (with design plans for chiller). Awaiting cost for adding a separate control panel for Landis to hook system up to BMS — proposal expected by Nov 1
Entities connected to both Marc Rich and Drive, & engineering fees

Jeffrey Epstein
PERSONLeon Black
PERSON
Ghislaine Maxwell
PERSON
Eric Trump
PERSON
Samantha Power
PERSON
New York
LOCATIONMaria Farmer
PERSON
David Rodgers
PERSON
Cabana
LOCATIONPinto
PERSON
Clark
PERSON
Solomon
PERSON
Cassidy
PERSONNicholas
PERSONSerge
PERSONPascal
PERSON
Italy
LOCATION
Paris
LOCATION
Alberto
PERSONLarry M
PERSON