5
Shared Docs
5
Same-Page
5 / 5
Mentions
n Avenue 4th Floor New York, NY 10022 tel cel Rich Horizon at this time does not provide monitoring
nch < Rich Attached Monitoring Contract for HVAC system at Zorro As discussed ECI's Contract for monitoring HVAC was not renewed and I approached Horizon Mechanical to provide a new contract. I would like to proceed with Horizon, starting October 1st 2015, on a monthly basis, at a cost of $427.50. ECI cost was $
To: Jeffrey Epstein <[email protected]> Cc: Rich Kahn Zorro Ranch .c: > Subject: ZDC-HWS-Leak D
zed pipe. Also the section of pipe that had the hole in it, was not insulated correctly and the back fill around the pipe was full of large rocks. Horizon Mechanical have replaced all HWS lines and CWS stub outs today. HWS and CWS have been turned back on to test both lines for leaks. If no other leaks are found
Gordon To: J Epstein <[email protected]> Cc: Rich Kahn < >, Zorro Ranch Subject: Re: ZDC MH Water
fter exposing 6 pipes, it was determined the leak was from a damaged copper irrigation line. The line was isolated and will be repaired Wednesday by Horizon Mechanical As of tonight the main house is back online. regards Brice On Mon, Mar 7, 2016 at 7:02 AM, Zorro Ranch < > wrote: Jeffrey Attached photo for yo
om: To: "Jeffrey E." <[email protected]> Cc: Rich Kahn Subject: ZM HP7B Master Bedroom Date: Sat,
note these units run 24/7 to maintain temperature and humidity levels in Library and Living room. The cost for these repairs, $5500.00 each Lastly, Horizon Mechanical ceased providing service to the Ranch in April 2017, I have reached out to numerous companies asking if they would be interested in providing a PMA
4th Floor New York, NY 10022 tel fax cell = Rich Horizon at this time does not provide monitoring
nch < Rich Attached Monitoring Contract for HVAC system =t Zorro As =iscussed SCI's Contract for monitoring HVAC was not =enewed and I approached Horizon Mechanical to provide a new =ontract. I =ould like to proceed with Horizon, starting October 1st 2015, on a =onthly basis, at a cost of $427.50. ECI cost was
Entities connected to both Marc Rich and Horizon Mechanical

Jeffrey Epstein
PERSON
Richard Kahn
PERSON
Condoleezza Rice
PERSONBrice Gordon
PERSON
Jes Staley
PERSON
Zorro
LOCATIONRanch
ORGANIZATION
Honeywell
ORGANIZATION
Horizon
ORGANIZATIONTrane
ORGANIZATIONRosemont
LOCATION