3
Shared Docs
3
Same-Page
3 / 3
Mentions
low are some cost figures provided by to me Bill W. for your consideration. Drilling the current bor
n of abandoning and redrilling the hole in a different location, but the current hole would need to be abandoned per OSE specifications. I met with Bill Whaley and Ronnie Dennison of HGS this morning to discuss the available options and costs. Below are some cost figures provided by to me Bill W. for your
EFTA_R1_02061554 EFTA02699339 =div> -- Casey W. Cook, P.E. Balleau Groundwater, Inc. 901 Rio Gr
install=tion for one to three hours to hydrate. Eliminating two seals wo=ld save up to six hours of construction/standby time. I have a call i= to Bill Whaley to find out whether the change would reduce his estimated d=illing costs. Mr. Anderson indicates that an email to him proposing th= change would be
ou wish to discuss =his in further detail. Casey W. Cook, P.E. Balleau Groundwater, Inc. 901 Rio Gr
rey vacation Subject: Fwd: Zorro Ranch Revised Attachments: FIGS Contract Revised.pdf; Untitled attachment 00660.htm I =ust spoke with the owner Bill Whaley who was reluctant to discount his =ricing any further than the $1,600 offered in this email. I was =ble to persuade him to agree to a total discoun
Entities connected to both George W. Bush and Bill Whaley

Jeffrey Epstein
PERSON
Marc Rich
PERSONDarren Indyke
PERSON
Richard Kahn
PERSON
Condoleezza Rice
PERSON
Albuquerque
LOCATIONCasey W. Cook
PERSONRio Grande Blvd
ORGANIZATIONBrice G.
PERSONBalleau Groundwater
LOCATION