alled new roller P/N 1159SCC228-23. All work I.A.W. GIV M/M 27-06.00. Billing Method Labor USD: Ti
p: 15.28.3 Completed Continue with removal of all requiered panels of CMP 553007; And Complied with steps B.(I) thru step B(22).All work done IAN' GIV AMM 53-30-00. Discrepancy: 15.29 CMP GIV 571011 Wing Front Beam Hi-Lite Collars (Left) - Inspection Resolution: COMPLIED WITH CMP GIV 571011 Wing Front
CK B THAT WAS TAKEN OFF PLANE. WORK WAS DONE I.A.W. DWG I 159WM2 0051 REV. L For detailed descriptio
TRUNNION L/H MOUNT PIN RETAINING BOLT AND REPOSITIONED PIN TO PROPERLY ALIGN GREASE FITTING. REINSTALLED RETAINING BOLT AND GREASED PIN. REFERENCED GIV AMM 32-24-01 FOR WORK PERFORMED. For detailed description of the work complied with see the Work Order Detail report Unless otherwise indicated, all f
P-Function Test. No defects noted. Work done I.A.W. GIV M. chap. 21.02.00. For detail description
hangar. All work done IAW Gulfstream GIV APU Retrofit Wiring Diagram 11595B49006. Rev L. sheet 3.001, for aircraft effectivity 1001, 1006.1182 and GIV AMM 49-60-00. Step: 12.1.10 Completed Complied with GIV-GER-9957 APU operational test after install of ASC 465. See item 6.9 for squawk. All other in
Entities connected to both George W. Bush and GIV AMM

Prince Charles
PERSON
Ghislaine Maxwell
PERSON
Julie K. Brown
PERSON
Stephen Hawking
PERSON
Samantha Power
PERSONDoug Band
PERSON
Dallas
LOCATION
Adriana Ross
PERSONJEGE, Inc.
ORGANIZATION
Savannah
LOCATIONAVIONICS
ORGANIZATIONRIVET
ORGANIZATIONDetail Subtotal USD
PERSONGulfstream Aerospace Corporation
ORGANIZATIONI.A.W.
ORGANIZATIONTime & Materials
ORGANIZATIONMAGNOLIA
ORGANIZATIONSEMKIT
ORGANIZATIONCOTTER
ORGANIZATIONSean Brown
PERSON