3
Shared Docs
3
Same-Page
3 / 3
Mentions
at 6:06 PM, jeffrey E. <[email protected]> wrote: do it carefully On Tue, Mar 1, 2016 at 7:40 PM, Jermaine Ruan < wrote: Good Evening Boss, Allan, Omar, Hector and I finalized our meeting for the needed materials required to equip GSJ with internet in a few days. I am requesting your permissi
isn't a complaint filed the sub-band frequency is released to be programmed into the radio. a. If the complaint is valid then the process between Micronet and the FCC is repeated. I verified this information with Hector and Allan during our meeting. They stated approximately the same steps, they have
From: Jermaine Ruan Sent: Wednesday, March 2, 2016 12:41 AM To: jeffrey E. Cc: ann rodriquez Subject: Choice internet Good Evening Boss, Allan, Omar, Hector and I finalized our meeting for the =eeded materials required to equip GSJ with internet in a few =ays. I =m requesting your permissi
e isn't = complaint filed the sub-band frequency is released to be programmed =nto the radio. a. If the complaint is =alid then the process between Micronet and the FCC is repeated. I verified this =nformation with Hector and Allan during our meeting. They stated =pproximately the same steps, they have
[email protected] <mailto:[email protected]=m» wrote: do it carefully On Tue, =ar 1, 2016 at 7:40 PM, Jermaine Ruan wrote: Good Evening Boss, Allan, Omar, Hector and I finalized our meeting for the needed=materials required to equip GSJ with internet in a few days. <=div> =div>l am requesting y
confirm tomorrow. Also Boss FYI: As per our discussion on the dragonwave licensing procedure. M= findings are as follows: I spoke to Ms. Hardly at=Micronet (the company that licensed your first dragonwaves) . Th=y confirmed the timeframe that FutureTech stated that this process does ta=e from 30 - 90 da
Entities connected to both Alan Dershowitz and Micronet