3/30 to install Has been installed but the remote is not working so Western Systems is trying to 3/28 complete SORT KEY JE- Mr. Epstein GM- Ms. Maxwell DI- Decorating Issues FC- Future Construction Issues HM- House Manual 1 EFTA00578182 Zorro Ranch Projects / Tasks List PROJ. SORT ASSIGN. DAT
t a price on the butternut carpet sample for the bunkhouse Sue will be out to measure bunkhouse to give an estimate2/26 Will have prices 3/27 for GM approval 2/25 Get estimate to repair roads Estimate sent to GM and Eric 3/13 E-mail from 3/21 not doing the roads per JE GM has asked us to exp
to 3/28 complete SORT KEY JE- Mr. Epstein GM- Ms. Maxwell DI- Decorating Issues FC- Future Construction Is
s on barn 2/27 Paint he shelves in the garage the same color as the walls Bobs paint will be out the week of the 19th of March. 3/26/ Complete Main House phone lines have interference and poor reception Val Comm and Sawyers are trouble shooting problems. 3/28 Sawyers is Fed Exing a new CPU card. 3
Painters have put the first coat of paint to make it look presentable. They will return after visit if anproved SORT KEY JE- Mr. Epstein GM- Ms. Maxwell SDI- DI- Decorating Issues Fe- Future Construction Issues House Manual 3 EFTA00578199 Zorro Ranch Projects / Tasks List PROJ. SORT ASSIGN. D
ight.JPCi JE 3/29 Eden to give quote to seed the remainder of areas at Main House 3/29 Seeding can begin after May 15th. Should have quote 3/30 GM Jeff 2/27Research auto pool vac Requesting your approval to purchase pool vac for $549.00 GM Jeff 2/27 Purchase brown utility shed for MH 3/1
al 3/23 complete SORT KEY JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FT- Future Constructio
se it is on a microwave line 3/28 should be on by Monday 4/1 3/28 Shana to purchase answering machine for GM to use until voice mail is hooked up Main House phone lines have interference and poor reception Val Comm and Sawyers are trouble shooting problems. 3/28 Sawyers is Fed Exing a new CPU card. 3
PROJ. SORT ASSIGN. DATE & DESCRIPTION STATUS COMP. TO DATE JE 2/27 Talk to Ricardo about the roof tile designs for landscape beds 3/31 Per GM - GM sent Ricardo fax. JE discontinued the services of Ricardo JE meeting with new designer JE 3/30 Grading at Main house and the new road design
3.00 quote for SORT KEY JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues Fe- Future Constructio
5,183.00 quote for SORT KEY JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues Fe- Future Constructio
but the remote is not working so Western Systems is trying to troubleshoot 3/28 3/28 New Remote has arrived Mike is programming 3/28 complete Main House phone lines have interference and poor reception Val Comm and Sawyers are trouble shooting problems. 3/28 Sawyers is Fed Exing a new CPU card. 3
on of films or TV transmissions. 4.24 The pavilion to the west (currently the kitchen) is refurnished as an office or private sitting room for Miss Maxwell. (The kitchen is rehoused elsewhere, adjacent to the new dining room). 4.3 Modification to the Great Room Verandah The present 6ft columns and t
rnished as an office or private sitting room for Miss Maxwell. (The kitchen is rehoused elsewhere, adjacent to
y a sheltered seat formed in the rocky outcrop that faces the seaward view. 6.55 The west point ends in a single outcrop of rock, visible from the Main House, that drops some 20ft to the rocky shore, poking out of the scrubby vegetation - which on this, the sheltered side of the island, is fairly thick.
10/31/09 - JEE 476.40 0.00 476.40 10/31/09 - GM 39,157.54 0.00 39,157.54 Total billed 49,114
Upcoming as of 12/15/09 thru 3/31/10 Total AIR GHISLAINE Final payment on Sikorsky 76-C++ 0 1,220,000
Improvements 428,836 84,877 343,959 Laundry 221,006 526 220,480 Kitchen 580,708 - 580,708 Mechanical Desal 3,234,370 8,420 3,225,950 Main House - 3,895 (3,895) Total Construction Projects 11,862,339 4,208,151 7,654,188 Hydraulic fittings for machines 4,993.58 ordered not yet paid for
n — a/c cuts off after 30 mins. ii) 13/12 — Diffusers need to be changed. The diffusers need to be specifically made and Serge will be contacting GM wk of 16 Dec to discuss this. + Update 3. Safe iii) 13/12 — Further delayed from 18 Nov — expecting to install by mid-Dec — scheduled for 16 De
The legs are being raised and will be returned 16 Dec. + NC 6. Carpet Cleaning vi) 13/12 — Scheduled for 17 Dec — living room, dining, bedroom & GM office. + Update 7. Stick Hi-fi Wires vii) 13/12 — Brian will attend to complete this 16 Dec. These need to be stuck down out of the way of the h
4. 40 Ft Digital Screen xxi) JE still to advise on proposal received from Larry Jacobson for cinema and drive-in. + Update + JE plse advise 16. Main House lutron system not working properly. xxii) 27/11 — It sounds like there is a short in the system. Gormac Electric is in touch with the Lutron Rep.
10/31/09 - JEE 476.40 0.00 476.40 10/31/09 - GM 39,157.54 0.00 39,157.54 Total billed 49,114
Upcoming as of 12/15/09 thru 3/31/10 Total AIR GHISLAINE Final payment on Sikorsky 76-C++ 0 1,220,000
Improvements 428,836 84,877 343,959 Laundry 221,006 526 220,480 Kitchen 580,708 - 580,708 Mechanical Desal 3,234,370 8,420 3,225,950 Main House - 3,895 (3,895) Total Construction Projects 11,862,339 4,208,151 7,654,188 Hydraulic fittings for machines 4,993.58 ordered not yet paid for
104 FRI- 4:00 PM- 6:00 PM • airily= MET WITH MS.MAXWELL TO DISCUSS WHAT NEEDS TO BE FIXED AROUND HOUSE-S
any and a technician explained how to reset alarm Alarm was reset an house, is fine u, " "Atil 43.1 . 1, 1.tter • EFTA00083555 Epstein House Main House. 4312: 1* Staff .4313 Alarm 7509 Password-Paula so .4, EFTA00083556 1 At I- ME6-DS 70 w se-09- k -4=60-y ot) I Oic...c, L pc et7,etc. 0e, 305
roposed concept, and JE is considering proposal. + + NC JE plse advise 2. Darren's Office to buy new furniture ii) JE wanted new furniture. GM to purchase new desk & cabinets for area & conference table & look at dividing unit for _& Darren. + JE Please advise 3. Directory Update ii
Complete. + NC 7. 40 Ft Digital Screen vii) JE still to advise on proposal received from Larry Jacobson for cinema and drive-in. 4 Update 8. Main House lutron system not working properly. viii) Completed. 4 4 NC JE to advise 9. Repeaters for MH Cell hone & Radio ix) Repeater costs $4K. Ins
roposed concept, and JE is considering proposal. + + NC JE plse advise 2. Darren's Office to buy new furniture ii) JE wanted new furniture. GM to purchase new desk & cabinets for area & conference table & look at dividing unit for & Darren. + JE Please advise 3. Directory Update iii
Complete. + NC 7. 40 Ft Digital Screen vii) JE still to advise on proposal received from Larry Jacobson for cinema and drive-in. 4 Update 8. Main House lutron system not working properly. viii) Completed. 4 4 NC JE to advise 9. Repeaters for MH Cell hone & Radio ix) Repeater costs $4K. Ins
Entities connected to both Ghislaine Maxwell and Main House

Jeffrey Epstein
PERSON
JPMorgan Chase
ORGANIZATION
George W. Bush
PERSON
Alan Dershowitz
PERSON
Michael Cohen
PERSON
Marc Rich
PERSONLeon Black
PERSON
Eric Trump
PERSONDarren Indyke
PERSON
Les Wexner
PERSON
Denver
LOCATIONLarry Visoski
PERSON
Lesley Groff
PERSON
Samantha Power
PERSON
Stephen Hawking
PERSON
Richard Kahn
PERSON
Palm Beach
LOCATION
Condoleezza Rice
PERSON
Ralph Lauren
PERSONCohen & Gresser LLP
ORGANIZATION