3
Shared Docs
3
Same-Page
9 / 3
Mentions
Zorro Ranch Projects / Tasks List PROJ. SORT ASSIGN. DATE & DESCRIPTION STATUS COMP. TO DATE JE 3/13 Zorro Ranch water status Memo 3/12/01 HM Advise Tamera that there needs to be water and food for Max at all times. Add details to house hol
be out Friday 3/30 to install Has been installed but the remote is not working so Western Systems is trying to 3/28 complete SORT KEY JE- Mr. Epstein GM- Ms. Maxwell DI- Decorating Issues FC- Future Construction Issues HM- House Manual 1 EFTA00578182 Zorro Ranch Projects / Tasks List PROJ. S
stems is trying to 3/28 complete SORT KEY JE- Mr. Epstein GM- Ms. Maxwell DI- Decorating Issues FC- Future
m clocks for guest bedrooms MH and guest lodge Total of 6 4 have been purchased still need 2 more (Blue rm and 1 for guest lodge) 3/22 Complete Blue Mobile home to be moved to gravel pit Electric disconnected 3/13 Phone disconnected 3/13 3/14 Complete 2/27 Have the courtyard tree lights repaired Fi
Zorro Ranch Projects / Tasks List PROJ. SORT ASSIGN. DATE & DESCRIPTION STATUS COMP. TO DATE JE 3/13 Zorro Ranch water status Memo 3/12/01 3/7 MBI is pressure testing the lines they should be complete 4/7. Once pressure testing is complete,
should be filed down Jeff to replace door handle 3/15 3/22 Jeff has put the handle on the door for JE approval 3/23 complete SORT KEY JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FT- Future Construction Issues HM- House Manual EFTA00578197 Zorro Ranch Projects / Tasks List PROJ.
r for JE approval 3/23 complete SORT KEY JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FT- Fu
m clocks for guest bedrooms MH and guest lodge Total of 6 4 have been purchased still need 2 more (Blue rm and 1 for guest lodge) 3/22 Complete Blue Mobile home to be moved to gravel pit Electric disconnected 3/13 Phone disconnected 3/13 3/14 Complete 2/27 Have the courtyard tree lights repaired Fi
Zorro Ranch Projects / Tasks List 4/4/01 PROJ. SORT ASSIGN. DATE & DESCRIPTION STATUS COMP. TO DATE JE 2/27 Talk to Ricardo about the roof tile designs for landscape beds 3/31 Per GM - GM sent Ricardo fax. JE discontinued the services of Ricardo J
t the wa11s3/14 Memo from Mil sent to JE 3/19 re: paving 3/22 waiting for instructions 2/23 JE approved the $5,183.00 quote for SORT KEY JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues Fe- Future Construction Issues 11Th House Manual EFTA00578213 Zorro Ranch Projects / Tasks List 4/4/01
E approved the $5,183.00 quote for SORT KEY JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues Fe- Fu
Shipped 3/6 to 71g street 3/6 complete the ranch 2/27 Have the courtyard tree lights repaired Fixed 3/10 — Transformer was out 3/10 complete Blue Mobile home to be moved to gravel pit Electric disconnected 3/13 Phone disconnected 3/13 3/14 Complete 2/27 Give Jeff note book for JE walk throughs 3
Entities connected to both Jeffrey Epstein and Blue Mobile

Ghislaine Maxwell
PERSON
Eric Trump
PERSON
Robert Gates
PERSON
Zorro
LOCATION
Oliver Stone
PERSON
Denver
LOCATION
O.J. Simpson
PERSON
Vernon
PERSONMain House
ORGANIZATIONSawyers
ORGANIZATION
Adrian
PERSON
Ricardo
PERSONGM/JE
ORGANIZATIONVal Comm
ORGANIZATIONWestern Systems
ORGANIZATIONTamera
PERSONRicardo fax
PERSONSterilizer
LOCATIONAbsolute Framing
ORGANIZATIONDATE & DESCRIPTION
ORGANIZATION